Allgemeine Informationen

IMO:
9521095
MMSI:
210415000
Rufzeichen:
5BZQ5
Breite:
22.0 m
Länge:
149.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Cyprus
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
204.9° / 0.0
Kompasskurs:
205.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
INDIAN OCEAN
Zuletzt empfangen::
2024-04-18
vor 15 Std
 
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 16 Std 
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-04-16
2024-04-17
23h 19m
2024-04-10
2024-04-11
1d 17m
2024-04-08
2024-04-10
2d 4h
2024-03-28
2024-04-01
3d 8h 21m
2024-03-23
2024-03-26
3d 10h 5m
2024-03-18
2024-03-19
16h 31m
2024-03-06
2024-03-07
20h 11m
2024-02-25
2024-03-01
5d 3h 38m
2024-02-23
2024-02-25
1d 12h 7m
2024-02-19
2024-02-20
1d 1h 21m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Queenscliff Melbourne
2023-06-20
Ankommen
Hong Kong Approach
2023-01-26
Ankommen
Hong Kong Approach
2023-01-25
Abfahren
Queenscliff Melbourne
2022-12-11
Ankommen
Queenscliff Melbourne
2022-12-09
Abfahren
Queenscliff Melbourne
2022-10-17
Ankommen
Queenscliff Melbourne
2022-10-08
Abfahren
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Disruptions of railway traffic after AAL Fremantle hit the Fremantle bridge

Mon Aug 18 11:17:31 CEST 2014 Timsen

The Fremantle rail bridge has been closed after it was hit by the "AAL Fremantle" which broke from its moorings as s storm swept across Perth and the South West on Aug 17, 2014, at 10.15 p.m. The "AAL Fremantle" and the car carrier "Grand Pioneer" were being unloaded in Fremantle harbour when both swung away from their North Quay berths about 10 p.m. The "AAL Fremantle" first allided with the bunker tanker before making contact with the Fremantle rail bridge, causing damage to scaffolding and an overhead power line. Thousands of people were without power and homes were damaged in the storm. Trains between Fremantle and North Fremantle have been cancelled and replaced by buses. The line could be closed for a week. The ship had just finished unloading a cargo of cars when the incident occurred. Another general cargo ship which went adrift after the stern lines broke, damaged a third vessel, the "Parmelia 1". The bridge was inspected by structural engineers after daybreak. Trains would run as normal to North Fremantle, but services between North Fremantle and Fremantle had been cancelled and replaced by buses operating between North Fremantle and Fremantle Station. There was likely to be some minor disruption to timetables over the rest of the line. One of the masts that support the train line’s overhead electrical power system was smashed and some of the supporting infrastructure sustained extensive damage in the crash. The disruption was likely to remain in place for at least a week while the damage was repaired and an investigation was completed to determine if there was any structural damage to the bridge. Reports with photos: https://au.news.yahoo.com/thewest/a/24738303/roofs-ship-and-trains-stricken-by-storm/ https://twitter.com/ben_j_hennessy/status/501153610948825088/photo/1 https://au.news.yahoo.com/a/24739390/container-ship-crashes-into-fremantle-bridge-as-wild-storm-lashes-wa/

Cargo Ship Breaks from Mooring in Fremantle, Strikes Rail Bridge

Mon Aug 18 10:06:25 CEST 2014 arnekiel

Strong winds of up to 110 kilometers per hour in Fremantle last night resulted in a cargo ship breaking free from its mooring in Western Australia on August 17. The incident occurred at about 10PM local time while stevedoring operations were in progress according to authorities, and involved a large general cargo ship AAL Fremantle berthed at North Quay berth 12. During last night’s storm, the stern of the vessel broke free from its berth and the vessel swung around and struck the Fremantle Rail Bridge. According to the ship owner, the impact of vessel on the railway bridge caused damage to overhead power lines as one of the power line pylons collapsed, which in turn caused power outages and cancellation of Fremantle train service between North Fremantle and Fremantle. Authorities are currently assessing the damage to the bridge. Five hours later, tugs brought the vessel back to its berth according to reports. http://gcaptain.com/cargo-shiop-breaks-mooring-fremantle-strikes-rail-bridge/

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data