Allgemeine Informationen

IMO:
MMSI:
316003137
Rufzeichen:
Breite:
6.0 m
Länge:
14.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Tug
Ship type:
Flagge:
Canada
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
360.0° / -128.0
Kompasskurs:
511.0° / -128.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
waiting
Gebiet:
Canada
Zuletzt empfangen::
2024-04-25
vor 2 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 43 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-04-23
2024-04-23
1h 25m
2024-04-19
2024-04-20
21h 26m
2024-04-18
2024-04-19
18h 28m
2024-04-18
2024-04-18
15h 2m
2024-04-17
2024-04-18
22h 39m
2024-04-09
2024-04-17
7d 5h 41m
2024-04-09
2024-04-09
3h 48m
2024-04-03
2024-04-03
4h 26m
2024-04-03
2024-04-03
2h 58m
2024-03-30
2024-03-30
49m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
-
-
-

Die neuesten Nachrichten

Tug grounded at Rix Island

Thu Nov 11 09:48:49 CET 2021 Timsen

On Nov 2, 2021, the 'Cadal', while hauling a barge from Kitimat to Kemano, ran aground. The crew was eating dinner around 7 p.m. and another deckhand was on watch when the vessel briefly got stuck at Rix Island in the Gardner Canal. The captain was able to reverse the vessel, and then used it to ram the barge it was towing to prevent it from also running aground. The man tightened up pretty good and later sought treatment for severe neck pain. The crew checked the vessel over to ensure it wasn’t taking on water, then completed the voyage to Kemano.

Steering problem in Masset Inlet

Tue Oct 08 18:52:10 CEST 2019 Timsen

The 'Cadal' with a crew of three on board was disabled due to a steering problem while towing a barge in the Masset Inlet, British Columbia, in position 53 58 11.2 N, 132 07 41.6 W, on Sep 27, 2019, at 05.10 a.m. The tug and the barge were towed to Port Clement, BC and the crew carried out repairs with shore assistance. The voyage was resumed after completion of repairs on Sep 28 at 11 p.m.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data