Allgemeine Informationen

IMO:
9385673
MMSI:
257356000
Rufzeichen:
LADV7
Breite:
44.0 m
Länge:
283.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Tankship
Ship type:
Flagge:
Norway
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
337.8° / 0.0
Kompasskurs:
312.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Lubmin (FSRU Neptune)
Gebiet:
Germany
Zuletzt empfangen::
2024-04-24
vor 2 Min
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 5 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2022-12-16
495d 30m
2022-11-29
2022-12-14
15d 3h 53m
2022-11-23
2022-11-27
3d 23h 34m
2022-11-13
2022-11-14
1d 4h 20m
2022-10-25
2022-10-26
1d 1h 16m
2022-10-19
2022-10-20
1d 2h 13m
2022-08-06
2022-09-10
34d 22h 44m
2022-08-01
2022-08-06
5d
2022-07-07
2022-07-08
1d 4h 29m
2022-06-17
2022-06-17
18m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Thiessow
2022-12-16
Ankommen
Mukran
2022-12-14
Ankommen
Mukran
2022-11-29
Abfahren
Mukran
2022-11-27
Ankommen
Mukran
2022-11-23
Abfahren
Mecklenburg Bay
2022-11-22
Abfahren
Fehmarn Nord
2022-11-22
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Engie opens First Floating LNG Import Terminal in Turkey

Thu Dec 29 08:04:44 CET 2016 arnekiel

ENGIE has been selected by project developers Kolin and Kalyon to deliver this fast-track Floating Storage and Regasification Unit (FSRU) based solution. The Group committed the Neptune, one of the two FSRU of its fleet, to the project. The 145,000 m3 capacity vessel will act as an LNG receiving and storage facility and will deliver natural gas in gaseous form. The overall infrastructure developed by Kolin and Kalyon includes a jetty and an onshore gas pipeline to connect the terminal to the national gas transport grid, operated by BOTAS. From final investment decision to completion, record breaking terminal project development took only 6.5 months. The Neptune vessel arrived at ETKI LNG terminal berth on December 11th fully loaded with LNG and proceeded immediately with commissioning operations.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data