Allgemeine Informationen

IMO:
9119397
MMSI:
235087119
Rufzeichen:
2EPP5
Breite:
20.0 m
Länge:
122.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
United Kingdom
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
281.6° / 0.0
Kompasskurs:
110.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Aberdeen (Matthews Quay)
Gebiet:
United Kingdom
Zuletzt empfangen::
2024-04-19
vor 3 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 6 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-04-19
27m
2024-04-18
2024-04-19
17h 21m
2024-04-18
2024-04-18
1h 55m
2024-04-17
2024-04-17
2h 51m
2024-04-17
2024-04-17
1h 43m
2024-04-16
2024-04-16
7h 13m
2024-04-14
2024-04-16
1d 18h 37m
2024-04-13
2024-04-13
9h 19m
2024-04-11
2024-04-11
8h 34m
2024-04-09
2024-04-09
12h 31m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Bassrock
2022-05-27
Abfahren
Hound Point
2022-05-27
Abfahren
Hound Point
2022-05-10
Ankommen
Bassrock
2022-05-10
Ankommen
Bassrock
2021-04-20
Abfahren
Hound Point
2021-04-20
Abfahren
Hound Point
2021-04-15
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Bottom touch in Stromness

Tue Jan 12 19:06:33 CET 2021 Timsen

The 'Helliar' had to be drydocked after touching the bottom off Stromness on Jan 11, 2020, at 4.09 p.m., with 23 crew members on board. The incident happened while covering the Pentland Firth route for the 'Hamnavoe', which is also in dry dock. The starboard propeller needed to be repaired after the ship ran onto a sandbank after diverting from the navigation channel while enroute to Scrabster. Divers were sent down in Stromness for a survey and found damage to hthe blades. A full inspection of the Helliar was to take place in Stromness from Jan 13. The 'Hamnavoe' will resume service on Jan 17.

Propeller problem enforces drydocking

Tue Oct 14 18:09:31 CEST 2014 Timsen

The "Helliar" was heading to dry dock in Liverpool on Oct 14, 2014, following a problem with one of its propellers. Once in dry-dock the problem will be looked at and repairs carried out. In the meantime the "Hildasay" was operating on a revised freight schedule and the ferry company was liaising closely with all stakeholders.

Rudder trouble resolved soon

Sun Aug 24 20:09:41 CEST 2014 Timsen

Serco NorthLink said that the ship could be back in service next week. The ship has been out of action since the July 31 after suffering from rudder problems. The "Helliar" was taken to dry dock at Cammell Laird in Birkenhead on Aug 2 following the rudder problem which was identified in Aberdeen. On arrival, it became apparent that both rudders and associated rudder stocks required immediate attention. Work on both rudders and stocks were currently being undertaken by specialist contractors in Denmark. During this time, the vessel was also undergoing work scheduled for her January 2015 dry dock, negating the need for her removal from service in late December/early January. The "Helliar"’s return to service was expected on Aug 25. In the meantime, the "Hildasay" continued to operate a revised freight schedule.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data