Allgemeine Informationen

IMO:
8876572
MMSI:
613003593
Rufzeichen:
TJMC49
Breite:
12.0 m
Länge:
82.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Other Ship
Ship type:
Flagge:
Cameroon
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
43.1° / 3.0
Kompasskurs:
61.0° / 3.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Callao (Sima Shipyard)
Gebiet:
Peru
Zuletzt empfangen::
2024-04-19
vor 4 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 6 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-04-18
20h 43m
2024-03-17
2024-03-22
4d 10h 20m
2024-02-08
2024-02-15
7d 4h 52m
2023-11-10
2023-11-13
2d 23h 28m
2023-11-07
2023-11-09
1d 16h 31m
2023-10-30
2023-11-02
3d 17h 37m
2023-09-08
2023-09-19
10d 14h 8m
2023-08-01
2023-08-03
2d 4h 48m
2023-06-30
2023-06-30
5h 15m
2023-06-02
2023-06-02
4h 42m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Canary Islands
2024-01-16
Ankommen
Fuerteventura
2024-01-16
Ankommen
Dover
2024-01-07
Ankommen
Calais
2024-01-07
Ankommen
Skagen
2024-01-04
Abfahren
Läsö DK
2023-12-28
Abfahren
Anholt
2023-12-28
Abfahren
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Freighter disabled in Istanbul Strait

Sun Dec 13 15:32:45 CET 2020 Timsen

The 'Sheksna' suffered a technical failure in the northern entrance of the Istanbul Strait, while en route from Taganrog to Fos-sur-Mer on Dec 10, 2020. The vessel went adrift, awaiting entrance permission 13,7 miles north of Rumeli Feneri in position 41 27 22 N, 029 10 07 E, as of 4.55 p.m. On Dec 13 the ship was underway again, transiting the Sea of Marmara with an ETA att Fos-sur-Mer as of Dec 21.

Detained ship released

Sat Nov 07 19:06:40 CET 2020 Timsen

The 'Sheksna' which had been detained in Sligo on Oct 16 has been released. She had been arrested two days after its arrival from the port of Sfax under the provisions of the Paris Memorandum of Understanding (MoU). The detention followed a routine Irish Marine Survey Office (MSO) inspection of the ship after its arrival in Sligo. The ship had been berthed at Deepwater Quay for almost a fortnight and had over 2,000 tonnes of olive stone granulate which was discharged before the ship was impounded. The ship left Sligo on Nov 6 after noon on high tide. The 11 crew members are still on board the ship but have been kept well-provisioned since their arrival. They had been re-supplied in recent days.

Grounding on the Elbe

Thu Sep 21 15:48:20 CEST 2017 Timsen

On Sep 21, 2017, at 6.47 a.m. the "Sheksna" ran aground on the Elbe off Hamburg-Cranz at the Mühlenberg Hole. The ship had loaded a 135-tons-generator at the J.J. Sietas Yard in Neuenfelde which was bound to Riga. Upon the return from the Este the ship got stuck with the outgoing tide, possibly having sailed too late. With the high tide at 6.20 p.m. tugs started to refloat the vessel. In the afternoon the tug "Löwe" (211590310) had connected to the vessel which was stuck within the fairway betwen the buoys EZ 7 and EZ 9. After the ship was pulled off, it was berthed at the Mönckeberg Quay in the Ellerholz Port in Hamburg at warehouse 76/77 for investigations before proceeding to the Jöhnk Yard in Harburg for repairs. It left the yard on Oct 10 at 9.45 p.m. after repairs and moored at the pilings in the Northern Elbe. The ship recently has also been engaged in the controversial transportation of nuclear materials to Hamburg, which made her a target for ecologist protests and criticism. German reports with photos and video: http://www.harburg-aktuell.de/index.php?option=com_content&view=article&id=14521 http://www.mopo.de/hamburg/polizei/atomfrachter-steckt-fest--sheksna--vor-blankenese-auf-grund-gelaufen-28452046 https://www.cn-online.de/stadt-land/news/frachter-bei-stade-auf-grund-gelaufen.html https://www.shz.de/regionales/hamburg/82-meter-langer-frachter-wieder-freigeschleppt-id17889486.html https://www.shz.de/regionales/hamburg/havarie-in-hamburg-82-meter-langer-frachter-laeuft-vor-cranz-auf-grund-id17889486.html https://www.tageblatt.de/lokales/blaulicht_artikel,-Frachtschiff-vor-der-Estemuendung-auf-Grund-gelaufen-_arid,1320114.html http://www.ndr.de/nachrichten/hamburg/Frachter-steckt-in-der-Elbe-fest,frachter464.html http://www.harburg-aktuell.de/news/vermischtes/14587-der-rostige-seelenverkaeufer-sheksna-liegt-im-harburger-hafen.html

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data