Allgemeine Informationen

IMO:
9372901
MMSI:
258865000
Rufzeichen:
LAWA
Breite:
21.0 m
Länge:
92.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Norway
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
256.1° / 0.0
Kompasskurs:
324.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
waiting
Gebiet:
North Europe
Zuletzt empfangen::
2024-04-24
vor 3 Min
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 2 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-04-24
19m
2024-04-23
2024-04-23
5h 4m
2024-04-22
2024-04-22
16h 41m
2024-04-19
2024-04-19
20h 28m
2024-04-13
2024-04-13
16h 32m
2024-04-07
2024-04-07
16h 20m
2024-03-29
2024-03-31
2d 1h 54m
2024-03-26
2024-03-27
1d 8h 53m
2024-03-21
2024-03-23
1d 10h 31m
2024-03-18
2024-03-19
8h 19m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Calais
2019-04-06
Abfahren
Dover
2019-04-06
Abfahren
Strait of Gibraltar
2019-04-01
Ankommen
Isla de Alboran
2019-04-01
Abfahren
El-Jazair
2019-03-31
Ankommen
Sizilien
2019-03-29
Abfahren
Pantelleria East
2019-03-28
Abfahren
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Eidesvik awarded with a contract with Saipem for the PSV “ Viking Queen”

Thu Feb 22 10:17:24 CET 2018 arnekiel

Norwegian vessel owner Eidesvik has been awarded a contract with Saipem for the PSV “ Viking Queen” to support the pipe-laying vessel “ Castorone”. Castorone will be engaged in laying pipes from the Johan Sverdrup field in the Norwegian sector of the North Sea to Mongstad and Kårstø oil and gas terminals in Norway. In December 2015, Statoil, on behalf of the Johan Sverdrup partners, awarded Saipem an installation contract for the Johan Sverdrup export pipelines project. Saipem is responsible for the installation of a 156 km 18-inch gas export pipeline for the Kårstø gas terminal, as well as approximately 282 km 36-inch oil export pipeline for the Mongstad terminal. The duration of the contract for the Viking Queen is estimated to be between 100 and 160 days, with start-up in March/April 2018. (Source: Subsea World News)

Smoke development on gas powered vessel

Fri Jan 31 17:26:37 CET 2014 Timsen

On Jan 31, 2014, at 3.50 p.m. the police in Kristiansund received notification of development of smoke aboard the "Viking Queen" The ship was docked in the western base in Kristiansund. Fire trucks and other emergency services were on site. It was found out that the smoke emerged from an installation in the engine room. The situation was under control within short time. Norwegian report with photo: http://www.brunsvika.net/nyhetsarkiv-alle-artikler/15412-royk-ombord-i-gassdrevet-skip

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data