General information

IMO:
7724019
MMSI:
677064500
Callsign:
5IM745
Width:
13.0 m
Length:
95.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Other Ship
Ship type:
Flag:
Tanzania
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Sailing
Course:
93.6° / 0.0
Heading:
183.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
Lebanon
Last seen:
2024-04-26
6 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
6 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-04-22
2024-04-25
2d 15h 8m
2024-04-16
2024-04-16
20h 19m
2024-04-03
2024-04-04
22h 44m
2024-03-09
2024-03-27
18d 1h 41m
2024-03-02
2024-03-06
3d 22h 38m
2024-02-16
2024-02-23
7d 6h 50m
2024-02-16
2024-02-16
2h 51m
2024-02-06
2024-02-15
9d 13h 33m
2024-01-23
2024-01-31
8d 5h 30m
2024-01-08
108d 10h 54m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Kreta
2020-09-22
Enter
Pantelleria West
2020-09-06
Leave
Sizilien
2020-09-06
Enter
Sizilien
2020-09-03
Leave
Pantelleria West
2020-09-03
Enter
Pantelleria West
2020-07-24
Leave
Sizilien
2020-07-24
Enter
Note: All times are in UTC

Latest news

Technical failure in Gabes

Sat Jan 09 16:13:35 CET 2021 Timsen

The 'Abo Alyssa' suffered a technical failure at Gabes on Jan 8, 2021. The vessel's departure permission was canceled by the Harbour Master until the completion of repairs and a verification by state surveyors. The ship was moored in pos. 33° 57.84' N 010° 12.26' E off Gabes.

Technical failure at Gabes

Thu Oct 10 10:01:23 CEST 2019 Timsen

The 'Abo Alyssa' suffered a technical failure at Gabes on Oct 7, 2019. The vessel's departure permission has been cancelled by the Harbour Master until the completion of repairs and verification by state surveyors. The vessel sailed from Gabes on Oct 15 and arrived in Damietta on Nov 8.

Technical failure off Bodrum

Tue Feb 19 10:36:28 CET 2019 Timsen

The "Abo Alyssa", being en route from Port Said West to Thessaloniki, sailing in ballast, suffered a technical failure off Bodrum on Feb 17, 2019. Repairs wre being carried out by the crew, while the vessel remained stationary at the Bodrum anchorage. On Feb 20 it arrived in Nemrut Bay.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data