General information

IMO:
9618135
MMSI:
219668000
Callsign:
OUKU2
Width:
23.0 m
Length:
114.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Denmark
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
31.8° / 0.0
Heading:
58.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Aalborg (Aalborg Container Terminal)
Area:
Denmark
Last seen:
2024-03-28
2 min ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
4 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-03-28
13h 4m
2024-02-25
2024-03-28
31d 23h 10m
2024-02-22
2024-02-23
1d 9h 47m
2024-02-20
2024-02-21
22h 29m
2024-02-16
2024-02-16
9h 48m
2024-01-22
2024-01-28
5d 23h 10m
2023-12-07
2023-12-12
5d 8h 55m
2023-11-19
2023-11-19
6h 13m
2023-11-15
2023-11-16
1d 4h 1m
2023-11-12
2023-11-13
1d 10h 13m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Skagen
2024-02-25
Enter
Weser Pilot Tonne 2
2024-02-23
Enter
Wangerooge
2024-02-23
Leave
Lighthouse Roter Sand
2024-02-23
Leave
Weser Pilot Innen
2024-02-23
Leave
Mellum
2024-02-23
Leave
Note: All times are in UTC

Latest news

Supply ship stuck in ice

Thu Oct 08 10:14:19 CEST 2020 Timsen

The 'Malik Arctica' got stuck in ice off its port of destination, Ittoqqortoormiit, in Southeast Greenland on Oct 7, 2020. The ship was loaded with winter supplies to Ittoqqortoormiit and had saile dfrom Aalborg on Sep 27. The vesssel now had to wait for ice conditions to improve. The ship was moving with a speed of 0,2 knots with the ice floe in eastern direction in the Kangertiqqivqay region in pos. 70° 11.28' W 022° 10.87'. But the weather changed so that the ship could get rid of the ice as early as Oct 8 evening.

Arctic supply ship sidelined due to main engine trouble

Fri Feb 09 16:44:10 CET 2018 Timsen

The "Malik Arctica", which berthed in Paamiut on Feb 8 at 5 p.m. suffered had a technical fault of the main engine which meant that the ship could not continue as scheduled. The damage was expected to be rectified in the middle of next week, so the vessel would be ready to start on the following supply trip according to the sailing plan. The Danish multi purpose carrier "Ivalo Arctica", 1194 gt (IMO: 9618147), had to take over the rest of the current rotation for the "Malik Arctica" and sailed from Nuuk to Paamiut to load goods for Narsaq, Qaqortoq and Nanortalik. The Royal Arctic Line expected the "Ivalo Arctica" to arrive in Paamiut in the night of Feb 10. Due to the limited size and capacity of the "Ivalo Arctic", the calls of South Greenland will be divided into two or three sailing trips.

Arctis supply trip delayed due to ice conditions

Mon Jul 17 09:48:37 CEST 2017 Timsen

The "Malik Arctica" was being significantly delayed on the current journey due to the ice conditions at Qaanaaq. The call at Qeqertaq was cancelled, and the "Malik Arctica" now expecting to return to Aalborg on July 29, 2017. This means that the ship will also be delayed on the next trip. Royal Arctic Line expected to be able to sail from Aalborg on July 31, nine days after the sailing plan. The "Malik Arctica" is Royal Arctic Line's newest ship. It was handed over from the Remontowa yard in Poland in February and put into operation in May. It was officially named in Nuuk in June.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data