General information

IMO:
MMSI:
244710037
Callsign:
PF7926
Width:
9.0 m
Length:
85.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Netherlands
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
62.5° / 0.0
Heading:
62.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
Netherlands
Last seen:
2024-04-23
3 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
17 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-04-23
2024-04-23
11m
2024-04-23
2024-04-23
16m
2024-04-23
2024-04-23
11m
2024-04-23
2024-04-23
19m
2024-04-22
2024-04-23
8h 5m
2024-04-22
2024-04-22
50m
2024-04-22
2024-04-22
20m
2024-04-22
2024-04-22
40m
2024-04-21
2024-04-21
18m
2024-04-21
2024-04-21
10m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Spaarndam
2024-04-10
Enter
Velsen Zuid
2024-04-10
Enter
Ijmuiden Sourth Locks
2024-04-10
Leave
Ijmuiden Sourth Locks
2024-04-10
Enter
Velsen Zuid
2024-04-10
Leave
Spaarndam
2024-04-10
Leave
Spaarndam
2024-04-05
Enter
Note: All times are in UTC

Latest news

De Walnood 2 replacing damaged bridge

Fri Mar 09 22:21:57 CET 2012 Timsen

The pedestrians ferry "De Walnood 2" was sent to the Burgervlot Bridge which was disabled after having been hit by the "Robbenzand". During the next month the small ferry is to carry pedestrians, cyclists and mopeds over the North Holland Canal The boat is running from 6 a.m. to 10 a.m. each day. Dutch report with photo and video: http://www.rtvnh.nl/nieuws/75843/Pont+%26%23039%3BDe+Noodwal%26%23039%3B+vervangt+kapotte+Burgervlotbrug

Robbenzand hit bridge

Fri Mar 09 10:31:19 CET 2012 Timsen

The "Robbenzand" allided with the Burgervlot Bridge in the morning of Mar 8, 2012. The floating bridge which is spanning the Noordhollands Canal was hit at 11.00 a.m. when the "Robbenzand" veered off course and ran into its side. An investigation of Provinciale Waterstaat showed that a bar had snapped. The repair of the bridge will take a few months. For pedestrians and cyclists a ferry was brought into service. Cars must detour through Schoorldam or St. Maartensvlot Bridge. Dutch report with photo: http://www.schagenfm.nl/index.php?option=com_content&view=article&id=3426563:vlotbrug-weer-geramd-door-schip&catid=nieuws

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data