General information

IMO:
9669093
MMSI:
370239000
Callsign:
3FEI3
Width:
36.0 m
Length:
62.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Other Ship
Ship type:
Flag:
Panama
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Restricted movement
Course:
79.2° / 0.0
Heading:
178.0° / 0.0
Speed:
Max speed:
Status:
waiting
Area:
North Sea
Last seen:
2024-04-25
< 1 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
3 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-04-10
2024-04-21
10d 10h 57m
2024-03-21
2024-03-29
7d 20h 7m
2024-03-19
2024-03-19
1h 16m
2024-01-11
2024-03-19
68d 3h 31m
2024-01-11
2024-01-11
1h 33m
2023-12-28
2024-01-09
11d 22h 30m
2023-11-21
2023-11-29
7d 23h 11m
2023-09-30
2023-10-08
7d 18h 47m
2023-09-22
2023-09-28
5d 21h 42m
2023-09-13
2023-09-15
2d 1h 1m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Ijmuiden Approach
2024-03-19
Enter
Amsterdam Breakwaters
2024-03-19
Leave
IJmuiden
2024-03-19
Leave
Ijmuiden North Locks
2024-03-19
Enter
Velsen Zuid
2024-03-19
Leave
Spaarndam
2024-03-19
Leave
Spaarndam
2024-01-11
Enter
Note: All times are in UTC

Latest news

Engine failure due to contaminated oil

Wed Jun 06 21:00:01 CEST 2018 Timsen

The "Seajacks Hydra" with a crew of 23 on board suffered an engine failure due to contaminated fuel in position 56 30.9N, 001 07.5W, on June 5, 2018, at 10.11a.m. The company tasked the tug "Kittiwake" which arrived at 4.20 a.m. and stayed with the "Seajacks Hydra" for the next 24 hours.

Seajacks Hydra commissioned in under 10 days by Damen Shiprepair Rotterdam

Wed Sep 10 12:37:52 CEST 2014 arnekiel

The Seajacks Hydra, a jack-up vessel owned by Seajacks UK Ltd., was commissioned within 10 days at Damen Shiprepair Rotterdam, which is part of Damen Shiprepair & Conversion. In late July, a heavy-lift vessel shipped the Seajacks Hydra platform into the port of Rotterdam. Seajacks Hydra was towed to the repair yard. It was a time-constrained project since the platform had to be delivered to a project of Seajacks which started in August. In spite of the tight schedule, Hydra was delivered on time. The scope of work was among other the installation of four azimuth thrusters (rudder propellers). The Seajacks Hydra was jacked-up 8 meters above the water surface, while divers kept an eye on the process and the soil condition. Source: Damen Shipyards Group

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data