General information

IMO:
9522207
MMSI:
370267000
Callsign:
3ESD6
Width:
36.0 m
Length:
63.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Other Ship
Ship type:
Flag:
Panama
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Restricted movement
Course:
51.6° / 0.0
Heading:
50.0° / 0.0
Speed:
Max speed:
Status:
waiting
Area:
SOUTH ATLANTIC OCEAN
Last seen:
2024-04-25
2 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
11 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-04-13
2024-04-22
9d 6h 18m
2024-02-29
2024-04-05
35d 20h 8m
2023-12-10
2023-12-24
14d 9h 5m
2023-10-29
2023-10-29
23h 7m
2023-10-16
2023-10-28
11d 23h 26m
2023-08-31
2023-09-01
1d 48m
2023-08-09
2023-08-24
14d 23h 59m
2023-05-05
2023-07-24
80d 18h 13m
2023-03-24
2023-03-25
1d 2h 7m
2023-03-11
2023-03-21
10d 8h 46m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Liverpool Approach
2023-10-28
Enter
Liverpool Approach
2023-10-16
Leave
St. Georges Channel
2023-08-30
Leave
Isle of Scilly
2023-08-29
Leave
Dover
2023-08-26
Enter
Calais
2023-08-26
Enter
Calais
2023-05-01
Leave
Note: All times are in UTC

Latest news

Refurbished Seajack vessel leaves Shipdock Amsterdam ready to work

Fri Aug 01 08:56:12 CEST 2014 arnekiel

‘Seajacks Leviathan’ and ‘Seajacks Kraken’ are prepared for their coming assignments, following a series of repair and renewal jobs by Shipdock Amsterdam. The shipyard, part of Damen Shiprepair & Conversion, had been commissioned for the two jack-ups by Seajacks UK Ltd. The Great Yarmouth (United Kingdom) based company has assigned the shipyard various and different major and minor adjustments on the two jack-up sister vessels in between North Sea offshore windfarm and oil & gas installation contracts. Shipdock Amsterdam’s major work on ‘Seajacks Kraken’ involved the replacement of the vessel’s two entire lifeboat davit sets. This included installing Niron Staal prefabricated foundations and the four new davits with their powerpack, cable, winch, electricity and hydraulic systems. This was finished off by surveyor-assessed test runs and loads test. Furthermore, the Kraken’s four legs were restored after an initial joint inspection round with the principal’s inspectors. Repairs involved S690 grade steel. In addition to crane tests and crane hook certification update surveys, the Seajacks jack-up vessel underwent miscellaneous minor steel work and had two new satellite dome platforms installed.

World's largest offshore wind turbine installed at Ormonde Offshore Wind Farm

Fri Aug 05 07:34:51 CEST 2011 arnekiel

Vattenfall has now completed the installation of the final turbine at its pioneering wind farm off the coast of north-west England. The 30th turbine at Ormonde Offshore Wind Farm was installed Monday with the final rotor lift from A2Sea s vessel, the SeaJack. Installation was completed four months after the first turbine was erected. Vattenfall now looks forward to generating electricity from the wind farm for the first time later this summer. Ormonde s 30 REpower 5M wind turbines have a total installed capacity of 150MW. It is capable of generating enough electricity annually to meet the equivalent electricity needs of 100,000 UK households. More at http://www.power-eng.com/news/2011/08/1472081438/united-kingdom-world-s-largest-offshore-wind-turbine-installed-at-ormonde-offshore-wind-farm.html

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data