General information

IMO:
9559872
MMSI:
305749000
Callsign:
V2FP5
Width:
16.0 m
Length:
132.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Antigua and Barbuda
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
212.3° / 0.0
Heading:
270.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Point Comfort (Point Comfort Harbor)
Area:
Gulf of Mexico
Last seen:
2024-03-28
3 hours ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
6 hours ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-03-27
17h 5m
2024-03-15
2024-03-17
1d 13h 48m
2024-03-05
2024-03-06
20h 57m
2023-12-29
2024-01-03
5d 1h 4m
2023-11-22
2023-11-23
1d 1h 8m
2023-11-01
2023-11-03
1d 19h 34m
2023-10-15
2023-10-17
2d 3h 41m
2023-10-14
2023-10-14
15h 47m
2023-10-12
2023-10-13
1d 18h 35m
2023-09-04
2023-09-06
2d 26m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Douala base buoy
2024-01-03
Enter
Douala base buoy
2023-12-29
Leave
Cape Town
2023-11-22
Leave
Haldia
2023-11-14
Enter
Ganges Approach
2023-11-14
Enter
Uluberia
2023-11-03
Enter
Uluberia
2023-11-01
Leave
Note: All times are in UTC

Latest news

Repairs nearly completed

Fri Apr 20 09:55:08 CEST 2018 Timsen

Repairs to the "BBC Nagasaki" which had sustained a main engine breakdown while departing from Orkanger on Feb 21 were soon to be completed. The vessel had been owed to Trondheim Trials on March 2. Trials and tests were completed on Apr 23.

Disabled vessel under tow to repair yard

Fri Mar 02 18:20:48 CET 2018 Timsen

On Feb 21, 2018, the "BBC Nagasaki", sailing in ballast, sustained a main engine breakdown while departing from Orkanger. The damage was reported to main engine crankshaft. Two tugs re-berthed the vessel at Orkanger. Engine repairs starte alongside at Orkanger On March 2 the ship was taken in to the Fosen Mek. Verksted A/S in Trondheim by the Norwegian tug "TB Oyvag" (IMO: 5255129) at 5.30 p.m. where repairs started to the damage at the main engine crankshaft. A new crankshaft for the main engine will have to be installed. The estimated time repair completion was now the first week of April.

Thor Commander towed to Gladstone

Thu Jan 15 11:10:36 CET 2015 Timsen

The "Thor Commander" arrived in Gladstone on Jan 15 at 7 a.m. on Thursday and has docked at Auckland Point wharf with the assistance of the tug "Smit Leopard" after having suffered a main engine failure on Jan 11. The ship, originally destined for Townsville, was being towed to Gladstone by the Gladstone-based tug afterit left its base on Jan 12 in the morning and attached a line to the ship on Jan 12 afternoon. Now repairs to the engine were to be done.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data