General information

IMO:
9372901
MMSI:
258865000
Callsign:
LAWA
Width:
21.0 m
Length:
92.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Tug
Ship type:
Flag:
Norway
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
256.1° / 0.0
Heading:
325.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Area:
North Europe
Last seen:
2024-04-25
2 min ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
8 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-04-24
19h 43m
2024-04-23
2024-04-23
5h 4m
2024-04-22
2024-04-22
16h 41m
2024-04-19
2024-04-19
20h 28m
2024-04-13
2024-04-13
16h 32m
2024-04-07
2024-04-07
16h 20m
2024-03-29
2024-03-31
2d 1h 54m
2024-03-26
2024-03-27
1d 8h 53m
2024-03-21
2024-03-23
1d 10h 31m
2024-03-18
2024-03-19
8h 19m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Calais
2019-04-06
Leave
Dover
2019-04-06
Leave
Strait of Gibraltar
2019-04-01
Enter
Isla de Alboran
2019-04-01
Leave
El-Jazair
2019-03-31
Enter
Sizilien
2019-03-29
Leave
Pantelleria East
2019-03-28
Leave
Note: All times are in UTC

Latest news

Eidesvik awarded with a contract with Saipem for the PSV “ Viking Queen”

Thu Feb 22 10:17:24 CET 2018 arnekiel

Norwegian vessel owner Eidesvik has been awarded a contract with Saipem for the PSV “ Viking Queen” to support the pipe-laying vessel “ Castorone”. Castorone will be engaged in laying pipes from the Johan Sverdrup field in the Norwegian sector of the North Sea to Mongstad and Kårstø oil and gas terminals in Norway. In December 2015, Statoil, on behalf of the Johan Sverdrup partners, awarded Saipem an installation contract for the Johan Sverdrup export pipelines project. Saipem is responsible for the installation of a 156 km 18-inch gas export pipeline for the Kårstø gas terminal, as well as approximately 282 km 36-inch oil export pipeline for the Mongstad terminal. The duration of the contract for the Viking Queen is estimated to be between 100 and 160 days, with start-up in March/April 2018. (Source: Subsea World News)

Smoke development on gas powered vessel

Fri Jan 31 17:26:37 CET 2014 Timsen

On Jan 31, 2014, at 3.50 p.m. the police in Kristiansund received notification of development of smoke aboard the "Viking Queen" The ship was docked in the western base in Kristiansund. Fire trucks and other emergency services were on site. It was found out that the smoke emerged from an installation in the engine room. The situation was under control within short time. Norwegian report with photo: http://www.brunsvika.net/nyhetsarkiv-alle-artikler/15412-royk-ombord-i-gassdrevet-skip

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data