General information

IMO:
9376050
MMSI:
212777000
Callsign:
5BJB2
Width:
22.0 m
Length:
134.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Cyprus
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
247.1° / 0.0
Heading:
246.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
Alboran Sea
Last seen:
2024-04-20
2 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
1 hour ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-04-17
2024-04-18
18h 48m
2024-04-16
2024-04-17
22h 53m
2024-04-13
2024-04-14
12h 25m
2024-04-11
2024-04-12
1d 3h 59m
2024-04-10
2024-04-10
7h 35m
2024-04-08
2024-04-08
5h 50m
2024-04-06
2024-04-07
14h 19m
2024-04-04
2024-04-05
9h 5m
2024-04-03
2024-04-03
13h 45m
2024-04-01
2024-04-02
23h 37m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Isla de Alboran
2024-04-19
Leave
Isla de Alboran
2024-04-15
Enter
Isla de Alboran
2024-04-13
Leave
Isla de Alboran
2024-04-07
Enter
Isla de Alboran
2024-04-06
Leave
Isla de Alboran
2024-03-30
Enter
Isla de Alboran
2024-03-29
Leave
Note: All times are in UTC

Latest news

New Charter

Tue Jun 29 20:09:55 CEST 2021 Swiss63

21 - 23 months trading Continent - North Spain - Marocco, 10'500Euro daily, Containerships

Fuel injector change in North Atlantic

Tue May 25 10:04:01 CEST 2021 Timsen

The 'Wilhelm', whle enroute from Le Havre to Casablanca, Morocco with 12 crew members on board, needed to change the oil injector of the main engine in position 49 34 53N, 003 57 19.0W, on May 22, 2021, at 1.15 p.m. At 1.45 p.m. the fault was rectified and the vessel resumed its voyage with an ETA as of May 25.

Engine failure in Northsea

Mon Apr 29 21:10:07 CEST 2019 Timsen

The "Wilhelm" suffered a main engine failure in position 050 23 57.6 N, 006 00 27 W on April 28, 2019 at 11.45 a.m. The ship was enroute from Dublin to Rotterdam. The crew estimated to take one hour for repairs to be completed. The ship meanwhile resumed the voyage. It berthed at the ECT Delta Container Terminal Amazonehaven on April 29 at 10.30 p.m.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data