General information

IMO:
9252280
MMSI:
235009956
Callsign:
VQPX7
Width:
15.0 m
Length:
85.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Tankship
Ship type:
Flag:
United Kingdom
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
331.3° / -2.0
Heading:
320.0° / -2.0
Speed:
Max speed:
Status:
moored
Location:
Southampton (Southampton Docks)
Area:
English Channel
Last seen:
2024-03-29
1 min ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
4 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-03-27
1d 5h 57m
2024-03-27
2024-03-27
4h 48m
2024-03-27
2024-03-27
3h 15m
2024-03-26
2024-03-27
10h 56m
2024-03-24
2024-03-26
1d 16h 58m
2024-03-24
2024-03-24
1h 5m
2024-03-23
2024-03-24
21h 17m
2024-03-23
2024-03-23
17h 54m
2024-03-22
2024-03-23
13h 43m
2024-03-21
2024-03-22
16h 41m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Southampton Approach
2024-03-27
Leave
Fawley Approach
2024-03-27
Leave
Selsey
2024-03-26
Enter
Portsmouth Approach
2024-03-26
Enter
Portsmouth Approach
2024-03-24
Leave
Fawley Approach
2024-03-24
Enter
Southampton Approach
2024-03-24
Enter
Note: All times are in UTC

Latest news

Bunker tanker with engine trouble

Sun Dec 22 11:55:37 CET 2019 Timsen

The 'Whitchampion'. en route from Southampton to St. Helens Anchorage, suffered engine trouble and consequently proceeded at reduced speed and with a reduced steering capability, in position 50 28 52.8 N, 000 17 18.6 E, on Dec 20, 2019, at 2 p.m. The tanker was carrying 3887 tonnes of gas oil as bunker on board. It berthed in Portsmouth on Dec 21 at 6 a.m.

Turbo charger failure off Portland Bill

Fri Oct 18 22:10:41 CEST 2019 Timsen

The 'Whitchampion', en route from Plymouth to Southampton with a crew of eight on board, suffered an engine turbo-charger failure six miles from Portland Bill in position 50 25 09 N, 002 25 09 W, on Oct 17, 2019, at 09.50 a.mThe vessel was diverted to Portland for repairs, and a tug was on the way from Portland. The tug assisted the vessel into Portland Harbour at 2.50 p.m. The estimated time for completion of repairs was about 48 hours.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data