General information

IMO:
9740720
MMSI:
232039981
Callsign:
MKQZ5
Width:
16.0 m
Length:
46.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Passenger ship
Ship type:
Flag:
United Kingdom
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
194.1° / 0.0
Heading:
202.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Area:
United Kingdom
Last seen:
2024-03-28
11 min ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
26 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-03-14
13d 16h 15m
2024-03-13
2024-03-13
1h 10m
2024-03-13
2024-03-13
27m
2024-03-12
2024-03-12
25m
2024-03-11
2024-03-11
30m
2024-03-11
2024-03-11
33m
2024-03-10
2024-03-10
31m
2024-03-10
2024-03-10
27m
2024-03-10
2024-03-10
1h
2024-03-09
2024-03-09
42m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Bassrock
2022-05-29
Leave
Hound Point
2021-11-19
Leave
Hound Point
2021-11-15
Enter
Bassrock
2021-11-15
Enter
Karsto Port Approach
2020-01-01
Enter
Note: All times are in UTC

Latest news

Ferry suffered generator trouble

Mon Dec 18 13:09:18 CET 2023 Timsen

Sailings between Oban and Craignure were affected on Dec 18, 2023, due to a technical issue with the generator of the 'Loch Frisa'. The 08:25 a.m. sailing departing Oban has been cancelled. After the issue was resolved, the vessel resumed service at 12:30 p.m., departing Craignure as scheduled.

More trouble with the Utne

Fri Sep 28 10:49:59 CEST 2018 Timsen

On Sep 27 more problems occurred with the "Utne" which had to be replaced by a passenger boat on the Fedje-Sævrøy route in the evening. There was leakage in one oil cooler so that oil was inthe cooling water, and the ship was sidelined in Fedje. Operator Norled was in touch with the manufacturer Scania for spare parts and assistance. The service was usually being operated by the "Fedjefjord" which actually was under maintenance at a yard. On Sep 28 it was not clear when the "Utne" would be in operation again, but it was expected to take some time to get the ship back in service.

Ferry sidelined due to technical trouble

Tue Sep 25 21:37:07 CEST 2018 Timsen

The "Utne" suffered technical problems with the bow port on Sep 25, 2018, and was sidelined. The 8.30 departure from Særøy to Fedje was cancelled at 5.35 p.m. Operator Norledd expected normal operation from the scheduled start in the morning of Sep 26. A passenger boat was inserted as a replacement in the meantime. The "Utne" itself had replaced the "Fedjefjord" which was undergoing maintenance. It was the first day for the "Utne" on the route.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data