General information

IMO:
9784192
MMSI:
257852500
Callsign:
Width:
25.0 m
Length:
54.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Passenger ship
Ship type:
Flag:
Norway
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
64.6° / 0.0
Heading:
122.0° / 0.0
Speed:
Max speed:
Status:
moored
Area:
North Sea
Last seen:
2024-03-28
1 min ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
4 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-02-28
2024-02-29
10h 2m
2024-01-19
2024-02-28
39d 21h 12m
2024-01-19
2024-01-19
1h 13m
2024-01-18
2024-01-19
15h 5m
2024-01-18
2024-01-18
1h 20m
2024-01-17
2024-01-18
16h 23m
2024-01-17
2024-01-17
1h 10m
2024-01-16
2024-01-17
16h 27m
2024-01-16
2024-01-16
1h 23m
2024-01-15
2024-01-16
16h 21m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Oslofjord
2019-04-22
Enter
Oslofjord
2018-10-24
Leave
Note: All times are in UTC

Latest news

Vision of the Fjords wins award recognising its accessibility and environmental achievements

Mon Oct 23 17:18:24 CEST 2017 arnekiel

Hybrid electric vessel Vision of the Fjords has won an award recognising its accessibility and environmental achievements. The 400-passenger capacity vessel, owned and operated by The Fjords DA, secured the Norwegian Centre for Design and Architecture (DOGA) Universal Design ‘transport’ award for its commitment to optimal passenger accessibility, experience and environmental sustainability. Rolf Sandvik, CEO of The Fjords, said: “…we ensured that the ‘path’ passengers use to ascend the ship, and really immerse themselves in the sensory delights of the nature here, is as accessible to those in wheelchairs, or of limited mobility, as it is to all. “There’s no stairs, no elevators, no obstructions, just a gently sloping surface leading everyone to unforgettable views.” http://www.maritimejournal.com/news101/industry-news/vision-of-the-fjords-wins-doga-accessibility-award

Repairs of hybrid ferry completed

Thu Aug 11 10:40:19 CEST 2016 Timsen

The "Vision of The Fjords" was back on track on the Nærøyfjord on Aug 10 starting from Flåm with 50 guests on board. The operator had been waiting for the approval by the shipping authority since Aug 8. The hybrid ferry was disabled with 41 passengers on board on Aug 7.

Blackout on hybrid ferry

Tue Aug 09 09:45:04 CEST 2016 Timsen

On Aug 7, 2016, the "Vision of The Fjords" was hit by a blackout during a voyage in the Nærøyfjord. The power was lost and everything stopped working. The hybrid ferry was moving extremely slow with eight knots, when the accident at 8.30 a.m. The crew managed to restart the ship's diesel engine so that the the ferry with 41 passengers and six crew on board could sail back to Flåm. The "Vision of the Fjords" was sent to the yard Brødrene Aa, which built the ferry, where technicians and subcontractors were going through all the ship's systems to find the fault that triggered the blackout. Recently a number of technical problems meant that the ferry could only start sailing in mid-July.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data