General information

IMO:
9759501
MMSI:
211666720
Callsign:
DHNV2
Width:
10.0 m
Length:
26.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
High-Speed Craft
Ship type:
Flag:
Germany
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
26.8° / 0.0
Heading:
277.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Borkum (Borkum Hafen)
Area:
North Sea
Last seen:
2024-04-16
4 min ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
4 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-04-13
2d 18h 49m
2024-04-09
2024-04-13
3d 18h 12m
2024-04-08
2024-04-09
13h 35m
2024-04-07
2024-04-08
1d 1h 35m
2024-04-06
2024-04-07
16h 10m
2024-04-04
2024-04-06
1d 14h 1m
2024-04-03
2024-04-04
21h 10m
2024-04-02
2024-04-03
21h 28m
2024-04-01
2024-04-02
14h 53m
2024-03-31
2024-04-01
12h 41m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Fischerbalje
2024-04-13
Leave
Borkum
2024-04-13
Leave
Borkum
2024-04-13
Enter
Borkum
2024-04-13
Leave
Borkum
2024-04-13
Enter
Borkum
2024-04-13
Leave
Borkum
2024-04-13
Enter
Note: All times are in UTC

Latest news

Crew ship started trials after repairs

Sat Dec 13 19:01:43 CET 2014 Timsen

The "Windea Three" has left the drydock of the Emder Shipyard and started trials on the Ems on Dec 13. Photos: http://forum-schiff.de/phpBB3/viewtopic.php?f=9&t=6007#p110140

Grounding on Scharhörn Reef

Tue Dec 09 21:10:53 CET 2014 Timsen

The "Windea Three" ran aground on the Scharhörn Reef off in the evening of Dec 6, 2014, while underway to the port. The ship got stuck at the edge of the bar around 16 nm NW of Cuxhaven. Due to an approaching storm the lifeboat "Hermann Helms" from the local DGzRS station immediately responded. The daughter boat "Biene" was unable to pull the supply ship off, so the lifeboat in spite of its draught of about two meters, which was about as much as the "Windea Three" had, approached the vessel in the surf, thereby touching the bottom several times itself. Finally a towing connection could be established, and the "Windea Three" was towed from the bar. The crew of seven was uninjured. The lifeboat escorted the "Windea Three" to the fishing port of Cuxhaven where both ships berthed around 9 p.m. The "Windea Three", which had started its service for the AG Offshore Ems only on 11 November, left Cuxhaven on Dec 8 entered the Emder Shipyard for repairs on Dec 9 around 6 a.m. Photos: https://www.facebook.com/amy.seehafen/media_set?set=a.353553478159582.1073742280.100005147980512&type=1

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data