General information

IMO:
MMSI:
211549030
Callsign:
DD9214
Width:
6.0 m
Length:
14.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Passenger ship
Ship type:
Flag:
Germany
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
0.0° / -128.0
Heading:
511.0° / -128.0
Speed:
Max speed:
Status:
waiting
Area:
Germany
Last seen:
2024-04-20
1 min ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
4 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2022-01-13
2023-12-15
700d 15h 49m
2016-01-29
2021-07-21
1999d 17h 29m
2016-01-27
2016-01-29
1d 16h 1m
2015-10-30
2016-01-27
88d 22h 29m
2014-05-07
2015-10-19
529d 22h 9m
2014-05-07
3635d 19h 55m
2014-05-07
2014-05-07
4m
2014-05-07
2014-05-07
5m
2014-05-07
2014-05-07
5m
2014-05-07
2014-05-07
5m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Holtenau
2024-04-19
Leave
Holtenau
2024-04-19
Enter
Holtenau
2024-04-19
Leave
Holtenau
2024-04-19
Enter
Holtenau
2024-04-19
Leave
Holtenau
2024-04-19
Enter
Holtenau
2024-04-19
Leave
Note: All times are in UTC

Latest news

Ferry suffered steering damage

Wed Sep 25 10:54:20 CEST 2019 Timsen

On Sep 24, 2019, at 3 p.m. the "Adler 1" suffered a damage to its steering system. The tug "Holtenau" took the ship in tow to a pier in Holtenau. The ferry had to be taken out of its service between Kiel-Wik and Kiel-Holtenau on the Kiel Canal for repairs. While theser were being carried out, a bus shuttle was inserted as a replacement.

Kiel Canal ferry sent to Rendsburg for repairs

Fri Jan 29 13:32:17 CET 2016 Timsen

On Jan 27, 2016, water intrusion at the propulsion shaft of the "Adler I2 was remarked. Due to a lack of dock space in Kiel the ferry was sent to the Saatsee Yard in Rendsburg for repairs and lifted onto the quay there. The return to Kiel was expected on Jan 29. Traffic information: http://www.wsa-kiel.wsv.de/Aktuelles/index.html

Adler 1 ran aground

Mon Mar 12 21:41:29 CET 2012 Timsen

On Mar 12, 2012, the "Adler 1“ ran into the embankment of the Kiel-Canal at Holtenau after a failed attempt to berth coming from Wik. The ship twice had tried to berth, during the third attempt the ferry missed the pier and got stuck. The captain refloated the ship with own power. The police launched an investigation and drug tested the master with negative result. The ferry may only resume its service after a hull survey by divers on Mar 13 on the earliest.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data