General information

IMO:
9207053
MMSI:
232007052
Callsign:
MATL3
Width:
20.0 m
Length:
106.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Other Ship
Ship type:
Flag:
United Kingdom
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
244.8° / 0.0
Heading:
246.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
Sea of Crete
Last seen:
2024-03-27
17 hours ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
16 hours ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-02-21
2024-02-23
1d 23h 9m
2024-02-08
2024-02-12
3d 13h 12m
2024-01-22
2024-01-24
2d 2h 42m
2024-01-04
2024-01-09
4d 23h 8m
2023-12-29
2023-12-29
7h 55m
2023-12-18
2023-12-18
3h 37m
2023-11-22
2023-11-22
7h 50m
2023-11-08
2023-11-14
5d 20h 32m
2023-09-09
2023-11-07
59d 3h 38m
2023-08-25
2023-09-02
8d 4h 6m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Strait of Messina
2024-02-20
Enter
Lipari Island
2024-02-20
Leave
Lipari Island
2024-02-12
Enter
Strait of Messina
2024-02-12
Leave
Strait of Messina
2024-02-08
Enter
Pantelleria East
2024-01-09
Leave
Strait of Messina
2024-01-03
Enter
Note: All times are in UTC

Latest news

Medevac off Genova

Thu Mar 16 11:50:12 CET 2023 Timsen

On March 15, 2023, a medevac was carried out from the 'SC Recorder' which was carrying out cable laying tasks off the port of Genova jointly be the harbour master's office, rescue sercices and the Green Cross. The on-board doctor called for help who, despite the worker's not very serious conditions, however preferred to have him treated ashore. The patient was picked up by a patrol boat of the Italian Coastguard due to appendicitis and taken to port. The man was transported to the Galliera hospital for checks.

Global Marine Group secures cable contract for Rampion Offshore Wind Farm

Sun Aug 20 07:49:06 CEST 2017 arnekiel

Global Marine Group (GMG), a leading provider of offshore engineering services to the renewables, telecommunications and oil & gas industries, announced that it has been awarded a contract from E.ON, an international, privately-owned energy supplier focused on renewables, energy networks and customer solutions, to install a fibre optic cable at the Rampion Offshore Wind Farm, under construction 13km off the coast of Sussex, UK. Upon completion the cable will run from the shore to an offshore substation, providing a vital communications link for this major wind farm. The installation is expected to be completed later this month. CWind, which is part of the GMG and is responsible for delivering the Company’s power capabilities, will execute the contract and will utilise the Group’s capable assets and project engineering team. The installation will centre on a 96-fibre armoured cable supplied from Hexatronic, installed by the CS RECORDER using the proven Hi-Plough to ensure appropriate cable protection in the hard chalk seabed.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data