General information

IMO:
7805203
MMSI:
257283400
Callsign:
LIBY
Width:
14.0 m
Length:
74.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Passenger ship
Ship type:
Flag:
Norway
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
183.9° / 0.0
Heading:
188.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Sandnes (Sandnes Port)
Area:
Norway
Last seen:
2024-03-28
2 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
3 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2023-04-17
346d 7h 20m
2023-03-30
2023-04-17
17d 18h 12m
2023-03-29
2023-03-30
11h 54m
2023-03-28
2023-03-29
13h 12m
2023-02-27
2023-03-23
23d 15h 2m
2023-02-27
2023-02-27
6h 54m
2023-02-25
2023-02-26
13h 30m
2021-10-21
2021-10-21
7h 12m
2021-10-03
2021-10-21
17d 14h 18m
2020-12-29
2020-12-29
56m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
-
-
-

Latest news

Human mistake caused grounding

Tue Dec 12 10:30:27 CET 2017 Timsen

Human failure was thought to have been the cause of the grouning of the "Hordaland" on Dec 7. The ferry was several hundred meters off course.It had been sailing between Årsnes and Varaldsøy in Kvinnherad and had 13 passengers and a crew of six on board who had to be evacuated. According to the ferry company Norled the navigator had been inattentive for several critical minutes. The ferry docked at the Halsnoy Dokk AS in Høylandsbygd for repairs on Dec 15 at 2 p.m.

Ferry still not stable

Fri Dec 08 11:42:13 CET 2017 Timsen

The "Hordaland" was still berthed in Varaldsøy on Dec 8. Thought crews repaired the damage temporarily on Dec 7, it was not yete safe to take the ferry into deep water. The diving team will be in place again at 11 a.m. There was no timetable for when the ferry might be towed to a dock for repair. Until the ferry has been moved away, there was only passenger traffic between Gjermundshamn-Varaldsøy-Årsnes in Kvinnherad. The transfer between Gjermundshamn and Årsnes normally takes 20 minutes directly and 40 minutes if the ferry crosses Varaldsøy. At 10.45 pm. Norled announced that the ferry service could be resumed after the "Hordaland" was towed away to another dock. Norwegian report with photo: http://www.osogfusa.no/nyhende/dykkarar-fra-os-skal-inspisera-ferjeskrog-1.2207069

Ferry has breach of 2-3 meters length

Thu Dec 07 17:09:34 CET 2017 Timsen

In the afternoon of Dec 7, ferry operator Norled had gained control of the situation and the damage to the "Hordaland" The leak was best possible patched, but still water had to be pumped out of the ferry. The hull breach was located by divers at 12.30 p.m. It was two to three meters long, five centimeters wide and was two meters below the waterline. The replacement ferry "Fitjar" was called from Gjermundshamn to Varaldsøy, and will take over the route as soon as the "Hordaland" has been towed away from the dock. Norwegian report with photo: https://grenda.no/leitar-etter-arsaka/

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data