Allgemeine Informationen

IMO:
MMSI:
211920000
Rufzeichen:
DRAD
Breite:
19.0 m
Länge:
150.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Other Ship
Ship type:
Flagge:
Germany
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
351.2° / 0.0
Kompasskurs:
352.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
NORTH ATLANTIC OCEAN
Zuletzt empfangen::
2024-04-14
vor 5 Tagen
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 5 Tagen
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-04-05
2024-04-08
3d 7h 13m
2024-03-24
2024-03-31
6d 22h 57m
2024-03-10
2024-03-14
4d 5h 6m
2024-02-28
2024-03-03
3d 23h 57m
2024-02-15
2024-02-19
4d 17m
2024-02-03
2024-02-06
3d 5h 11m
2024-01-14
2024-01-23
9d 2m
2024-01-09
2024-01-10
20h 29m
2024-01-08
2024-01-09
1d 26m
2023-12-20
2024-01-03
14d 18m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Strait of Gibraltar
2024-04-14
Ankommen
Isla de Alboran
2024-04-13
Abfahren
Strait of Messina
2024-04-11
Abfahren
Kreta
2024-04-10
Abfahren
Kreta
2023-10-28
Ankommen
Pantelleria East
2023-10-26
Ankommen
Sizilien
2023-10-26
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

German Navy sends large combat ship into crisis region

Tue Oct 17 21:23:41 CEST 2023 Timsen

The German Navy is sending one of its largest combat ships off the coast of Lebanon, the “Baden-Württemberg” is scheduled to take part in the UN mission Unifil from the end of October. This means that Germany has a large ship on scene in the crisis area in the eastern Mediterranean for the first time. The deployment of the frigate was already planned in the summer. Since then, the approximately 120 crew members have been preparing for the mission. With the frigate, the Navy has a significantly larger ship than before in the crisis region, which gives the federal government more options for action. Other NATO partners have also sent naval units to the region in recent days. At the end of October, the ship, commanded by Tilmann von der Lühe (44), is scheduled to replace the smaller corvette “Oldenburg” in Limassol. The “Oldenburg” left Rostock-Warnemünde in August. From Cyprus, the “Baden-Württemberg” will then remain off the Lebanese coast until probably mid-January 2024. According to the UN resolution, the mission is maritime surveillance and support for the training of the Lebanese Navy within the framework of the UN mandate. This is the first time since December 2009 that a frigate has been sent as a German contribution to the Unifil operation off Lebanon. The German Navy was one of the first contributors to the Unifil operation. Since 2010, it has provided tenders, corvettes and minehunters from Kiel or Warnemünde for this mission. Since 2019, the “Baden-Württemberg” has completed an extensive training program. The crew was also trained long off the ports of Kiel and Eckernförde.

Frigate troubled due to fault in fuel system

Thu Sep 14 10:45:36 CEST 2023 Timsen

The participation of the “Baden Württemberg” at the DSEI (Defence and Security Equipment International) arms trade fair in London was canceled at short notice due to technical problems that have to be resolved. The engine problems had previously occurred at sea due to a fault in the fuel system. The frigate was most recently sailing on the North Sea, after leaving Bergen on Aug 20, 2023. The frigate has been at the Wilhelmshaven naval base since Aug 222. The problem appeared to have occurred around this date. The “Baden Württemberg” is actually scheduled to sail on its first mission in October. The Navy wants to use the frigate to monitor the Mediterranean off the coast of Lebanon on behalf of the United Nations.

German Navy refused to take over new fregate from yard due to technical shortcomings

Fri Dec 22 09:53:31 CET 2017 Timsen

For the first time in history, the German Navy returned a shiup to its builders which had already been taken over. The reasons were considerable software and hardware defects on board the "Baden-Württemberg". The Navy declined the commissioning of the ship, and the competent arms office demanded from the shipyard Blohm + Voss in Hamburg to eliminate the shortcomings. With that, the three-billion-Euro project "F125" faltered again. The frigate, which was built for six years, will have a longer layover in Hamburg starting on Jan 19, 2017 Extensive functional evidence at sea had not been provided during the trials which took place in the North Sea, off Norway and before Kiel. The consortium Arge F125 now has the opportunity to correct the faults. The consortium consists of Thyssen Krupp Marine Systems (TKMS/Kiel), which owns the Blohm + Voss Yard, and Lürssen (Bremen).

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data