Allgemeine Informationen

IMO:
9381990
MMSI:
511100803
Rufzeichen:
T8A4015
Breite:
24.0 m
Länge:
92.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Other Ship
Ship type:
Flagge:
Palau
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
152.7° / -2.0
Kompasskurs:
235.0° / -2.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Warri (Warri Port)
Gebiet:
Nigeria
Zuletzt empfangen::
2024-04-19
vor 4 Min
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 4 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-04-12
2024-04-18
5d 18h 20m
2024-04-10
2024-04-12
1d 16h 22m
2024-03-12
2024-03-15
3d 6h 15m
2024-03-03
2024-03-04
23h 40m
2024-01-25
2024-03-03
38d 3h 11m
2024-01-18
2024-01-18
1h 6m
2023-03-18
2023-03-20
1d 20h 49m
2023-02-28
2023-03-18
18d 5h 16m
2023-01-19
2023-01-20
16h 20m
2022-12-23
2023-01-19
26d 11h 37m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Canary Islands
2024-03-25
Ankommen
Fuerteventura
2024-03-25
Ankommen
Strait of Gibraltar
2024-03-22
Ankommen
Isla de Alboran
2024-03-22
Abfahren
El-Jazair
2024-03-20
Ankommen
Sizilien
2024-03-18
Abfahren
Pantelleria East
2024-03-18
Abfahren
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Blue Ship cited by USA for work on Nord Stream 2

Tue Nov 23 18:05:47 CET 2021 Timsen

The USA imposed sanctions on the 'Marlin' for its involvement in the construction of the Nord Stream 2 gas pipeline, as the Biden administration looks to exert more pressure on Russia without antagonizing Germany. In a report sent to Congress on Nov 22, 2021, the administration designated the Transadria Ltd., a Cyprus-based entity believed to be a Russian shell company, over pipeline work done by the 'Marlin', according to a statement from Secretary of State Antony Blinken. Another vessel, the 'Blue Ship', was cited for its work on the pipeline but not sanctioned because it belongs to an entity affiliated with the German government. The construction of the pipeline was finished in September, and the first of two lines is already filled with gas. While the U.S. has longed opposed the project, it’s extending its sanctions list without provoking German leaders who are determined to see the project through. The two vessels were included in a report that the administration is required to send to Congress every 90 days as part of a law that was passed in 2020 and is meant to slow or halt completion of the pipeline.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data