Allgemeine Informationen

IMO:
9228083
MMSI:
355236000
Rufzeichen:
3FWZ6
Breite:
32.0 m
Länge:
190.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Panama
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Anchored
Kurs:
86.6° / 0.0
Kompasskurs:
169.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
anchorage
Gebiet:
Bay of Bengal
Zuletzt empfangen::
2019-12-10
vor 1 Min
Source:
T-AIS
Zielort:
ETA:
Max. Tiefgang:
Letzter Tiefgang:
Letztes Update:
vor 1 Std
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2019-11-01
2019-11-04
2d 22h 57m
2019-10-30
2019-11-01
2d 1h 24m
2019-09-20
2019-09-20
3h 25m
2019-09-19
2019-09-19
18h 15m
2019-09-18
2019-09-19
10h 29m
2019-08-10
2019-08-16
5d 13h 19m
2019-08-02
2019-08-08
5d 23h 4m
2019-07-10
2019-07-14
3d 14h 51m
2019-06-29
2019-06-29
52m
2019-06-28
2019-06-29
1d 46m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Malacca Straits - North
2019-11-24
Abfahren
Malacca Straits - Penang Island
2019-11-23
Ankommen
Malacca Straits - Port Klang
2019-11-23
Ankommen
Kukup Island
2019-11-22
Ankommen
Balboa Approach
2019-09-24
Ankommen
Puente de las Americas
2019-09-20
Ankommen
Miraflores Locks
2019-09-20
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Hydraulic power failure off Port Cartier

Wed Jun 05 20:55:37 CEST 2019 Timsen

The "Bulk Beothuk" while berthing in Port Cartier, suffered a main hydraulic power failure, which prevented the use of mooring winches and windlasses, on June 3, 2019. As the vessel could not berth or anchor, it left the port and remained in the area at manoeuvring speed while waiting for a shore technician to join the vessel for inspection and repairs. The ship sailed from the port on June 9, bound for Apapa-Lagos, ETA Jun 24.

Crane cable broke

Sat Nov 17 18:33:35 CET 2018 Timsen

A cable of one of the cranes of the "Bulk Beothuk" broke and fell into the cargo hold no.1, while loading in Becancour, Quebec, in position 046 24 00 N, 072 22 32.4 W, on Nov 12, 2018, at 4.10 p.m. No one on board was injured. the ship left port on Nov 15 at 5.30 p.m., bound to Wilmington, USA.

Cooling system failure in Quebec

Wed May 02 20:30:36 CEST 2018 Timsen

The "Bulk Beothuk" was disabled due to a main engine cooling system failure, while proceeding out of the bay of Sept-Iles, Quebec, in position 50 06 16.2N, 66 12 20.4W, on Apr 25, 2018, at 3.40 p.m. The vessel proceeded to an anchorage to carry out the repairs. On May 2 at 2.15 p.m. it left the Sydney region and headed to Amsterdam, ETA Apr 11.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data