Allgemeine Informationen

IMO:
9400473
MMSI:
305200000
Rufzeichen:
V2DV7
Breite:
25.0 m
Länge:
162.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Antigua and Barbuda
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
83.9° / 1.0
Kompasskurs:
2.0° / 1.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Gebiet:
Spain
Zuletzt empfangen::
2024-03-29
vor 4 Min
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 4 Tagen
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-03-25
3d 19h 9m
2024-03-15
2024-03-20
4d 10h 59m
2024-03-02
2024-03-10
7d 23h 44m
2024-02-15
2024-02-19
3d 17h 3m
2024-02-04
2024-02-14
9d 22h 43m
2024-01-27
2024-02-01
5d 6h 41m
2024-01-08
2024-01-13
4d 22h 28m
2023-11-28
2023-12-03
4d 23h 21m
2023-11-25
2023-11-25
4h 54m
2023-11-22
2023-11-25
2d 23h 25m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
St. Georges Channel
2024-03-22
Ankommen
St. Georges Channel
2024-03-14
Abfahren
St. Georges Channel
2024-02-26
Ankommen
Terschelling
2024-02-04
Abfahren
Den Helder
2024-02-04
Ankommen
Calais
2024-02-03
Abfahren
Dover
2024-02-03
Abfahren
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Combi Lift signs contract with Schenker for two ships for Gorgon LNG project

Wed Jan 11 12:51:25 CET 2012 arnekiel

Combi Lift said it has signed a contract with Schenker for two of their semisubmersible ships for the Gorgon LNG project. The duration of the contract is 1 year with option of 2 years for delivery of supplies to the start-up of the project on Barrow Island in the western part of Australia. More at http://worldmaritimenews.com/archives/43701

Dockwise completes complex boat transport operation in Phuket

Fri Nov 04 08:11:18 CET 2011 arnekiel

Dockwise Yacht Transport (DYT) completed its most complex lift-on/lift-off procedure to date using the 532-foot (162.3 meters) transport vessel Combi Dock 1, owned by Combi Lift, which left Genoa, Italy on 7 October and arrived safely in Phuket, Thailand on 28 October with seven yachts aboard, including five motor yachts over 100-feet (30.5-meters) in length and a 95-foot (29-meter) catamaran with a 41-foot (12.6-meter) beam. Report with photos at http://www.sail-world.com/Europe/DYT-completes-complex-operation-in-Phuket/90319 and at Dockwise site http://www.yacht-transport.com/page/dytlatest/smooth-operating-in-the-most-com.html

Drill machine for new miami port tunnel arrives

Fri Jun 24 09:41:37 CEST 2011 arnekiel

The $45-million German-built massive machine that will drill a tunnel to the Port of Miami arrived Thursday evening aboard Combi Dock I, so big it came packed in separate pieces inside large boxes and crates. Arrival of the machine marked the most important milestone in the $1 billion project since the Florida Department of Transportation and the private tunnel builder, Miami Access Tunnel, struck a final agreement in late 2009. “This is a monumental day for the people of Miami-Dade County,” said Ric Katz, a spokesman for the Florida Department of Transportation (FDOT), who watched the arrival of the container ship Combi Dock 1 from South Pointe Park in South Beach. “This is the arrival of the tunnel boring machine that will, when assembled, build this important tunnel that will connect Watson Island with Dodge Island, our seaport, this county’s second most important economic generator.” Report with video http://www.miamiherald.com/2011/06/23/2281986/machine-to-drill-port-of-miami.html?asset_id=Tunnel%20boring%20machine%20arrives&asset_type=html_module

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data