LIDER AMIRAL
Kurs/Position
Die letzten Häfen
Die letzten Wegpunkte
Die neuesten Nachrichten
Ship detained in Novorossyisk for repairs
The 'Lider Amiral' suffered a failure of its navigation system and emergency fire pump at Novorossiysk on July 31, 2020. The departure permission has been temporarily cancelled by the harbour master until completion of repairs and an investigation by state surveyors. The repairs were carried out by the crew.
Anchor system failure in Tuapse
The 'Lider Amiral' suffered an anchor system failure at Tuapse on Dec 11, 2019. The vessel's departure permission was temporarily cancelled by the Harbour Master until completion of repairs. After state surveyors attended the ship and verified the final repair status, it was granted departure permission on Dec 13 and arrived at its destination Samsun on Dec 15 at 5.20 a.m.
News schreiben