Allgemeine Informationen

IMO:
8616568
MMSI:
259753000
Rufzeichen:
LAEL7
Breite:
44.0 m
Länge:
224.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Norway
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
109.6° / 0.0
Kompasskurs:
146.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Anjeong (STX Goseong Offshore & Shipbuilding - Berth Area 01)
Gebiet:
Korea Strait
Zuletzt empfangen::
2024-03-28
vor 2 Min
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 7 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-03-25
3d 19h 43m
2024-03-13
2024-03-18
5d 6h 35m
2024-01-17
2024-01-17
3h 6m
2024-01-15
2024-01-16
35m
2023-11-01
2023-11-04
3d 1h 53m
2023-02-16
2023-02-17
12h 48m
2023-01-09
2023-01-18
9d 3h 8m
2022-12-05
2022-12-13
7d 21h 54m
2022-11-11
2022-11-11
6h 24m
2022-03-11
2022-04-25
45d 37m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Kukup Island
2024-03-07
Abfahren
Malacca Straits - Port Klang
2024-03-06
Abfahren
Malacca Straits - Penang Island
2024-03-06
Abfahren
Cape Town
2024-02-16
Ankommen
Canary Islands
2024-01-31
Ankommen
Dover
2024-01-25
Ankommen
Calais
2024-01-25
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Steel tripods arrive for Scotland's Moray East offshore wind project

Wed May 06 12:56:56 CEST 2020 Timsen

The first of 103 giant steel foundations for the Moray East wind farm off Scotland have been delivered to the Port of Nigg aboard the 'Osprey' for final staging before being transported out for installation at the 950MW project site in the North Sea. The three-legged jackets will be topped with 9.5MW MHI Vestas V164 turbines, bar a trio that will support substations at the wind farm, being developed by a project consortium made up of Diamond Green, EDPR, Engie and China Three Gorges, along with DEME Offshore as lead contractor. The jackets, delivered by OHT’s heavy transportation vessel Osprey, are among the 48 being fabricated at Lamprell’s site in Hamriyah, UAE, and shipped via the Cape of Good Hope on a 12,000 nautical mile journey to the Cromarty Firth, a 39-day transit. Global Energy Group has invested over £50m into the facilities at the Port of Nigg, a former offshore oil & gas construction yard with deepwater berths, to position it as a staging port for the UK offshore wind build, targeted to reach 40GW by 2030. Moray East is slated to be online in 2022 – at price of £57.50/MWhr, two-thirds lower than offshore wind farms in operation off the UK today – generating enough electricity to supply almost 1 million UK homes, while saving 1.4 million tonnes of CO2 emssions annually. Near-term progress on the wind farm has been thrown into question after the vessel meant to install the jackets, DEME’s 'Orion 1' had its main crane collapse while be outfitted for the project in Rostock. Report with photo: https://www.rechargenews.com/wind/jackets-required-steel-tripods-arrive-for-scotlands-moray-east-offshore-wind-project/2-1-803242

OSPREY underway with newbuilding Jack-Up Rig KUKULKAN to Mexico

Mon Apr 27 06:50:44 CEST 2015 arnekiel

Last weekend April 25, OHT’s semi submersible heavy load ship OSPREY loaded the newbuilding Jack-Up Rig KUKULKAN in Singapore for transportation to Mexico The OSPREY submerged to the required draft and the rig was delivered alongside by 4 Keppel-Smit harbour tugs.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data