Allgemeine Informationen

IMO:
9141376
MMSI:
357244000
Rufzeichen:
3FEP
Breite:
13.0 m
Länge:
89.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Panama
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
90.0° / 127.0
Kompasskurs:
98.0° / 127.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
Bulgaria
Zuletzt empfangen::
2024-04-25
vor < 1 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 3 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-04-19
5d 16h 56m
2024-04-17
2024-04-18
8h 13m
2024-03-29
2024-04-02
4d 7h 30m
2024-03-28
2024-03-28
12h 58m
2024-03-02
2024-03-03
1d 7h 27m
2024-03-01
2024-03-02
11h 35m
2024-02-24
2024-02-27
3d 18m
2024-02-19
2024-02-23
3d 11h 44m
2024-02-13
2024-02-19
6d 3h 49m
2023-12-30
2023-12-31
12h 33m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Bosphorus Bridge 2
2024-04-18
Abfahren
Bosphorus Bridge 1
2024-04-18
Abfahren
Marmara Island
2024-04-17
Abfahren
Strait of Messina
2024-04-05
Ankommen
Lipari Island
2024-04-05
Abfahren
Fos Approach
2024-04-02
Ankommen
Fos-sur-Mer
2024-04-02
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Engine repairs completed

Mon Nov 22 20:26:30 CET 2021 Timsen

The 'Dancing Queeen' has completed its repairs and shifted from the shipyard in Tuzla to the anchorage area in order to carry out sea trials together with final tests. A new set of trading certificates will be issued by the classification society and flag state authorities upon completion of the sea trial inspection. The vessel remained stationary at Tuzla anchorage in pos. 40° 50.68' N 029° 14.19' E as of Nov 22.

Disabled ship under repair at Tuzla

Sat Sep 04 21:27:09 CEST 2021 Timsen

The 'Dancing Queen', which had suffered an engine failure at Las Palmas on July 10, arrived in Tuzla and entered a shipyard upon completion of formalities. The class surveyor, together with owner's superintendent and shipyard duty engineers, carried out a damage survey. Subsequently, shore-based technical team commenced repairs.

Engine failure at Las Palmas

Mon Jul 26 10:30:19 CEST 2021 Timsen

The ÄDancing Queen' suffered an engine failure at Las Palmas, on July 10, 2021. As repairs could not be carried out by the crew, the tug 'Monte Da Luz' (IMO: 9710153) was contracted to tow the vessel to Istanbul. The towage operation commenced on July 15 at 11.30 p.m. with an ETA as of Aug 4.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data