Allgemeine Informationen

IMO:
9669093
MMSI:
370239000
Rufzeichen:
3FEI3
Breite:
36.0 m
Länge:
62.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Other Ship
Ship type:
Flagge:
Panama
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Restricted movement
Kurs:
323.5° / 0.0
Kompasskurs:
178.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
waiting
Gebiet:
North Sea
Zuletzt empfangen::
2024-04-24
vor < 1 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 4 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-04-10
2024-04-21
10d 10h 57m
2024-03-21
2024-03-29
7d 20h 7m
2024-03-19
2024-03-19
1h 16m
2024-01-11
2024-03-19
68d 3h 31m
2024-01-11
2024-01-11
1h 33m
2023-12-28
2024-01-09
11d 22h 30m
2023-11-21
2023-11-29
7d 23h 11m
2023-09-30
2023-10-08
7d 18h 47m
2023-09-22
2023-09-28
5d 21h 42m
2023-09-13
2023-09-15
2d 1h 1m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Ijmuiden Approach
2024-03-19
Ankommen
Amsterdam Breakwaters
2024-03-19
Abfahren
IJmuiden
2024-03-19
Abfahren
Ijmuiden North Locks
2024-03-19
Ankommen
Velsen Zuid
2024-03-19
Abfahren
Spaarndam
2024-03-19
Abfahren
Spaarndam
2024-01-11
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Engine failure due to contaminated oil

Wed Jun 06 21:00:01 CEST 2018 Timsen

The "Seajacks Hydra" with a crew of 23 on board suffered an engine failure due to contaminated fuel in position 56 30.9N, 001 07.5W, on June 5, 2018, at 10.11a.m. The company tasked the tug "Kittiwake" which arrived at 4.20 a.m. and stayed with the "Seajacks Hydra" for the next 24 hours.

Seajacks Hydra commissioned in under 10 days by Damen Shiprepair Rotterdam

Wed Sep 10 12:37:52 CEST 2014 arnekiel

The Seajacks Hydra, a jack-up vessel owned by Seajacks UK Ltd., was commissioned within 10 days at Damen Shiprepair Rotterdam, which is part of Damen Shiprepair & Conversion. In late July, a heavy-lift vessel shipped the Seajacks Hydra platform into the port of Rotterdam. Seajacks Hydra was towed to the repair yard. It was a time-constrained project since the platform had to be delivered to a project of Seajacks which started in August. In spite of the tight schedule, Hydra was delivered on time. The scope of work was among other the installation of four azimuth thrusters (rudder propellers). The Seajacks Hydra was jacked-up 8 meters above the water surface, while divers kept an eye on the process and the soil condition. Source: Damen Shipyards Group

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data