Split

General information

Name:
Split
Country:
Croatia
UN/Locode:
HRSPU
Local time:
Moored Vessels:
57
Expected Vessels:
22
Berths:
1
Coordinates:
N 43° 30' E 016° 26'

Moored Vessels

Name
Type
Moored
Passenger Ship
18.04. 16:34
Passenger Ship
18.04. 18:46
Cargo Ship
18.04. 15:48
Passenger Ship
23.10. 11:14
Cargo Ship
18.04. 07:39
Passenger Ship
18.04. 21:33
Cargo Ship
11.04. 11:36
Cargo Ship
18.04. 10:58
Fishing Vessel
16.04. 11:09
Cargo Ship
18.04. 21:20

Expected Vessels

Name
Type
Expected
Passenger Ship
18.04. 23:35
Tanker
20.04. 14:00
Cargo Ship
05.06. 01:00

Sailed Vessels

Name
Type
Sailed
Passenger Ship
18.04. 21:03
Passenger Ship
18.04. 20:37
Passenger Ship
18.04. 20:33
Passenger Ship
18.04. 20:01
Passenger Ship
18.04. 19:33
Passenger Ship
18.04. 18:38
Passenger Ship
18.04. 18:05
Cargo Ship
18.04. 17:16
Passenger Ship
18.04. 16:44
Passenger Ship
18.04. 16:36

Latest news

Quark Expeditions signs newbuild contract with Brodosplit

Wed Jun 13 11:45:25 CEST 2018 arnekiel

A contract has been signed between Quark Expeditions and Brodosplit for a new polar expedition ship specifically built for the high latitudes of the Arctic and Antarctica. The 128-metre long ship will be built to Polar Class 6 standards and will accommodate 200 passengers in 103 cabins when delivered in the third quarter of 2020.

Polar Explorer Hondius Launched

Mon Jun 11 12:06:26 CEST 2018 arnekiel

Oceanwide Expeditions' new polar cruise ship Hondius has been launched at Brodosplit shipyard in Croatia. Hondius is the first-registered Polar Class 6 vessel in the world. The Polar Class 6 vessel will offer deluxe accommodation for 176 passengers sailing both the Arctic and the Antarctic. She will be equipped with two main engines for a total of 4,200 kW, generating a speed of 15 knots. The propulsion system consists of two medium speed main engines and one adjustable pitch propeller. The flexible power management system (in combination with a shaft generator instead of a diesel-driven generator) is designed to reduce fuel consumption and CO2 emissions. https://www.maritime-executive.com/article/polar-explorer-hondius-launched#gs.FFxv2XU

Brodosplit close to bag cruise ship order from Germany

Sat Jun 10 11:21:18 CEST 2017 arnekiel

Croatian media report that Brodosplit is negotiating a cruise ship newbuilding contract worth EUR 340m.

Upload News