General information

IMO:
7917018
MMSI:
667001648
Callsign:
9LU2451
Width:
16.0 m
Length:
108.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Sierra Leone
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
0.0° / -128.0
Heading:
0.0° / -128.0
Speed:
Max speed:
Status:
moored
Location:
Area:
Black Sea
Last seen:
2024-03-28
3 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
5 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-03-12
15d 20h 56m
2024-02-10
2024-02-10
8h 41m
2024-01-27
2024-01-27
14h 26m
2024-01-08
2024-01-11
3d 5h 22m
2023-11-15
2023-11-16
15h 19m
2023-09-28
2023-09-30
1d 7h 18m
2023-09-18
2023-09-23
4d 12h 55m
2023-09-01
2023-09-01
10h 3m
2023-07-23
2023-07-30
7d 3h 52m
2023-07-20
2023-07-22
1d 11h 55m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Bosphorus Bridge 2
2024-02-10
Leave
Bosphorus Bridge 1
2024-02-10
Leave
Bosphorus Bridge 1
2024-01-27
Enter
Bosphorus Bridge 2
2024-01-27
Enter
Bosphorus Bridge 2
2024-01-11
Leave
Bosphorus Bridge 1
2024-01-11
Leave
Marmara Island
2023-11-16
Enter
Note: All times are in UTC

Latest news

Ship suffered engine failure

Fri Jul 23 16:36:49 CEST 2021 Timsen

The 'Altenavi', en route from Kherson to Iskenderun, suffered an engine failure south of Alanya in position 35 58 30N, 032 11 30E, on July 21 ,2021. Repairs were started by the crew, and as of July 23 the ship was adrift in pos. 35° 56.40' N 031° 43.92' E.

Cargo ship damaged in allision

Wed Nov 08 09:10:26 CET 2017 Timsen

On Nov 7, 2017, at 9 a.m. the "Altenavi" allided with a dam under construction in the Venice lagoon while leaving the Marghera port, Venice. The ship had left the Azozo Quay at 8 a.m. and, having transited the Petroli Canal, was about to leave the port which was being bounded by the two dams of Alberoni and Santa Maria del Mare. The ship was sailing in ballast, after offloading cargo of cereals at Marghera. While exiting, it suddenly veered to starboard and ran onto the crescent-shaped dike with its east-west slopes which will be protecting the movable dams of the Mose in the future. Winds on scene were about 40 km/h with a swell from the East. The bow and underwater foreship were damaged, and the ship suffered had water ingress. The captain requested immediate assistance, and the three tugs "Elma C", "Marina MC" and "Angelina C" moved the ship to the center of the basin and then took it to the San Marco Basin. At midday the more powerful tug "Elma C" joined the convoy while it headed towards the Petroli canal. At 3.30 p.m. the "Altenavi" was brought back to Porto Marghera and moored at the Venice Commercial Terminals at the north quay of the North Industrial Channel. Italian report with photo: http://nuovavenezia.gelocal.it/venezia/cronaca/2017/11/07/news/nave-cargo-salvata-dal-naufragio-sulla-lunata-degli-alberoni-1.16089764?refresh_ce

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data