General information

IMO:
9321287
MMSI:
304742000
Callsign:
V20Y1
Width:
14.0 m
Length:
48.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Tug
Ship type:
Flag:
Antigua and Barbuda
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
86.0° / 0.0
Heading:
87.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Liverpool (Huskisson Dock)
Area:
United Kingdom
Last seen:
2019-09-18
3 min ago
Source:
T-AIS
Destination:
ETA:
Max Draught:
Last drought:
Last update:
4 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2019-09-11
6d 23h 58m
2019-09-03
2019-09-03
18h 16m
2019-08-19
2019-08-19
15h 19m
2019-08-06
2019-08-07
1d 5h 49m
2019-07-12
2019-08-03
21d 7h 5m
2019-07-08
2019-07-09
1d 3h 31m
2019-06-26
2019-06-27
1d 2h 17m
2019-06-26
2019-06-26
4h 8m
2019-05-29
2019-06-15
17d 10h 19m
2019-05-17
2019-05-24
6d 20h 23m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Liverpool Approach
2019-09-11
Leave
Liverpool Approach
2019-09-03
Enter
Liverpool Approach
2019-09-03
Leave
Liverpool Approach
2019-08-19
Enter
Liverpool Approach
2019-08-19
Leave
Liverpool Approach
2019-08-07
Enter
Liverpool Approach
2019-08-06
Leave
Note: All times are in UTC

Latest news

Repairs completed

Sat Oct 01 16:58:29 CEST 2016 Timsen

Repairs of the "Bremen Fighter" have finally been completed at the Lloyd Yard in Bremerhaven, three months after having suffered propulsion damage in a wind park on July 1. The ship left the yard on Sep 29 ready for service.

Repair of propulsion after wire wrapped up around propeller

Tue Jul 19 10:59:51 CEST 2016 Timsen

The "Bremen Fighter" had to be drydocked at the Mützelfeldt Yard in Cuxhaven for repairs of propulsion on July 1, 2016, after the ship was damaged during a manoever in a wind park off the Irish coast. A towing wire wrapped up around the propeller shaft when a crane ship was repositioned. The ship limped back to Cuxhaven with the remaining engine. During the recent two weeks the rudder, Propeller, shaft and gear were removed and transported to the manufacturers in Kiel and Hamburg for repairs. In the meantime the ship was towed to the yard quay. The owners hoped to have the repairs completed in October, the damage was estimated to be some 100000 Euros. German reports with photos: http://www.cn-online.de/stadt-land/news/schlepper-bekommt-draht-in-die-schraube.html http://www.cn-online.de/stadt-land/news/reparaturauftrag-fuer-muetzelfeldtwerft.html

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data