General information

IMO:
9228083
MMSI:
355236000
Callsign:
3FWZ6
Width:
32.0 m
Length:
190.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Panama
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Anchored
Course:
206.1° / 0.0
Heading:
141.0° / 0.0
Speed:
Max speed:
Status:
anchorage
Area:
Golfo de Panamá
Last seen:
2019-09-21
1 min ago
Source:
T-AIS
From:
Destination:
ETA:
Max Draught:
Last drought:
Last update:
6 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2019-09-20
2019-09-20
3h 25m
2019-09-19
2019-09-19
18h 15m
2019-09-18
2019-09-19
10h 29m
2019-08-10
2019-08-16
5d 13h 19m
2019-08-02
2019-08-08
5d 23h 4m
2019-07-10
2019-07-14
3d 14h 51m
2019-06-29
2019-06-29
52m
2019-06-28
2019-06-29
1d 46m
2019-06-06
2019-06-09
2d 6h 21m
2019-06-06
2019-06-06
50m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Puente de las Americas
2019-09-20
Enter
Miraflores Locks
2019-09-20
Enter
Pedro Miguel Locks
2019-09-19
Enter
Gatun Locks
2019-09-19
Enter
Gatun Locks
2019-09-19
Leave
Gatun Locks
2019-09-19
Enter
Colon Approach
2019-09-19
Enter
Note: All times are in UTC

Latest news

Hydraulic power failure off Port Cartier

Wed Jun 05 20:55:37 CEST 2019 Timsen

The "Bulk Beothuk" while berthing in Port Cartier, suffered a main hydraulic power failure, which prevented the use of mooring winches and windlasses, on June 3, 2019. As the vessel could not berth or anchor, it left the port and remained in the area at manoeuvring speed while waiting for a shore technician to join the vessel for inspection and repairs. The ship sailed from the port on June 9, bound for Apapa-Lagos, ETA Jun 24.

Crane cable broke

Sat Nov 17 18:33:35 CET 2018 Timsen

A cable of one of the cranes of the "Bulk Beothuk" broke and fell into the cargo hold no.1, while loading in Becancour, Quebec, in position 046 24 00 N, 072 22 32.4 W, on Nov 12, 2018, at 4.10 p.m. No one on board was injured. the ship left port on Nov 15 at 5.30 p.m., bound to Wilmington, USA.

Cooling system failure in Quebec

Wed May 02 20:30:36 CEST 2018 Timsen

The "Bulk Beothuk" was disabled due to a main engine cooling system failure, while proceeding out of the bay of Sept-Iles, Quebec, in position 50 06 16.2N, 66 12 20.4W, on Apr 25, 2018, at 3.40 p.m. The vessel proceeded to an anchorage to carry out the repairs. On May 2 at 2.15 p.m. it left the Sydney region and headed to Amsterdam, ETA Apr 11.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data