General information

IMO:
8917417
MMSI:
352846000
Callsign:
3FSM5
Width:
17.0 m
Length:
93.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Panama
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
0.0° / 0.0
Heading:
341.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Area:
Turkey
Last seen:
2024-03-29
2 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
5 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-03-20
2024-03-23
3d 14h 43m
2024-03-15
2024-03-15
9h 41m
2024-03-09
2024-03-09
19h 56m
2024-03-02
2024-03-03
23h 28m
2024-02-22
2024-02-23
18h 52m
2024-02-15
2024-02-16
1d 36m
2024-02-04
2024-02-05
15h 15m
2024-01-27
2024-01-27
15h 36m
2024-01-22
2024-01-23
19h 56m
2024-01-13
2024-01-14
21h 42m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Bosphorus Bridge 1
2024-03-19
Enter
Bosphorus Bridge 2
2024-03-19
Enter
Bosphorus Bridge 2
2023-01-15
Leave
Bosphorus Bridge 1
2023-01-15
Leave
Bosphorus Bridge 1
2023-01-08
Enter
Bosphorus Bridge 2
2023-01-08
Enter
Bosphorus Bridge 2
2022-12-14
Leave
Note: All times are in UTC

Latest news

Repairs of grounding damage completed

Fri Mar 18 19:28:41 CET 2022 Timsen

Permanent repairs of the 'T Moon' have been complete in shipyard. Subsequently, the vessel was shifted from the shipyard to the Yalova anchorage, where it carried out sea trial performance test with satisfactorily result on March 16. A new set of trading certificates was issued by the monitoring classification society and the flag state authority. The ship was next bound to Kavala with an ETA as of March 18, but remained anchored off Tuzla that day.

Repairs in final phase

Mon Jan 17 13:00:46 CET 2022 Timsen

The repairs of the 'T Moon' in Yalova were being expected to be completed by the end of January 2022. Sea trials along with tightness tests will then be carried out at the anchorage area under the supervision of a class surveyor and the owner's superintendent.

Ship shifted to Yalova for further repairs and maintenance

Wed Nov 17 10:18:03 CET 2021 Timsen

The 'T Moon' has been shifted from Tuzla to the Yalova shipyard area in order to complete remaining outstanding repairs. The fire pump and piping systems also required renewal and repairs. The ship remained stationary at Yalova as of Nov 17.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data