General information

IMO:
8921937
MMSI:
209563000
Callsign:
5BFC5
Width:
10.0 m
Length:
38.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Other Ship
Ship type:
Flag:
Cyprus
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
307.0° / 16.0
Heading:
310.0° / 16.0
Speed:
Max speed:
Status:
moving
Area:
United States
Last seen:
2019-04-25
1828 days ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
1812 days ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2019-04-24
1829d 46m
2018-09-22
2019-04-24
214d 3h 54m
2018-09-04
2018-09-22
17d 21h 37m
2018-09-03
2018-09-04
1d 1h 46m
2018-09-02
2018-09-03
17h 53m
2018-09-02
2018-09-02
2h 31m
2018-08-31
2018-09-02
1d 19h 44m
2018-08-12
2018-08-31
19d 6h 43m
2018-03-26
2018-08-12
138d 18h 50m
2017-12-24
2018-03-26
91d 16h 49m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Miami approach 4 miles
2019-04-24
Enter
Note: All times are in UTC

Latest news

Grounded ferry back in port after more than three months

Sun May 27 15:36:24 CEST 2012 Timsen

The "Maverick Dos" was finally taken to the port Moll de la Pansa in Denia on May 24. The 110-tons-crane which had lifted the ship from the rocks of the island Sa Turreta and the ferry crossed the Canal d'Eivissa each on a separate pontoon. At 8 a.m. the crane was visible from the coast, and shortly after 10.30 a.m. the ship entered port and is now being surveyed by technicians. The salvage plan de was developed by Protection and Indemnity Insurance, the stability calculated by the engineering company Cotenaval at the Colegio Oficial de Ingenieros Navales. Ship's owners Baleària presented the plan to the Capitanía Marítima d'Eivissa and the government for approval. Since its grounding, the ferry was replaced by the "Ibiza Jet" of Trasmapi. Spanish reports with photos: http://www.levante-emv.com/comarcas/2012/05/26/llega-puerto-denia-gran-grua-flotante-ferri-encallo-formentera/908160.html http://www.lasprovincias.es/20120525/mas-actualidad/sucesos/crucero-remolcado-formentera-ibiza-201205251807.html

BIMINI BLUE MARLIN 8921937

Fri May 25 10:13:54 CEST 2012 Timsen

The positioning of the "Maverick Dos" onto a barge on May 24, 2012, took longer than expected. Though the vessel was removed from its grounding site a large crane mounted on a barge, which was towed by the "Gorgos" in the afternoon of May 23, the transport to Denia shipyard did not take place immediately afterwards. The ship remained high above the water hanging in the crane's slings. With the first light of May 24 the last phase of the operation was resumed. The ship was still hanging in the cables of the crane. At 10.30 a.m. the ferry was lowered onto the deck of the second barge which was being towed by the "Charuca Silveira". The journey to the yard, commenced around 12.30, with a speed of four knots, followed by the barge with the crane used by the Usabiaga company. Spanish report with photo: http://www.diariodeibiza.es/formentera-hoy/2012/05/25/maverick-abandona-islas-rumbo-astillero-denia/556421.html

Grounded ferry taking a flight

Thu May 24 09:43:20 CEST 2012 Timsen

The "Maverick Dos" was successfully lifted from the rocks in Sa Torreta, Formentera,on May 23. The crane with a lifting capacity of 600 tons which was was mounted on a barge of 35x25 meters and which was provided with a counterweight of 130 tons, hoisted the stranded ship on a pontoon. Spanish report with photo: http://www.elmundo.es/elmundo/2012/05/24/baleares/1337844835.html

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data