General information

IMO:
9197442
MMSI:
304940000
Callsign:
V2ZV5
Width:
11.0 m
Length:
87.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Antigua and Barbuda
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
126.7° / 0.0
Heading:
122.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Tallinn (Bekker Port)
Area:
Estonia
Last seen:
2024-04-19
2 min ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
17 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-03-03
2024-03-16
12d 17h 20m
2024-02-29
2024-02-29
42m
2024-02-28
2024-02-29
18h 43m
2024-02-28
2024-02-28
1h 1m
2024-02-26
2024-02-26
47m
2024-02-21
2024-02-26
4d 21h 37m
2024-02-21
2024-02-21
1h 22m
2024-02-14
2024-02-14
2h 27m
2024-02-05
2024-02-07
2d 13h 51m
2024-01-30
2024-02-01
2d 5h 22m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Hanko FI
2024-03-03
Leave
Ristna EE
2024-03-03
Leave
Bornholmsgat
2024-03-01
Leave
Mecklenburg Bay
2024-03-01
Leave
Fehmarn Nord
2024-02-29
Enter
Kiel Pilot
2024-02-29
Leave
Kiel Laboe
2024-02-29
Leave
Note: All times are in UTC

Latest news

Oil pipe leakage repaired

Tue Apr 07 13:02:40 CEST 2020 Timsen

The 'Marne', while en route from Londonderry to Margate Roa with seven crew members on board, suffered a leakage in its oil pipe in position 50 10 24 N, 003 01 29 W, on April 6, 2020, at 8 a.m. The damage was repaired at 9.10 a.m., and the 'Marne' resumed its voyage at 09.25 a.m. with an ETA as of April 7, 2 p.m.

Cooling system trouble in Bristol Channel

Wed Mar 28 10:30:20 CEST 2018 Timsen

Enroute from Gibraltar to Birkenead, the "Marne", loaded with 2744 tonnes of fuel pipes and having a crew of seven on board, reported a problem with the cooling system on March 26, 2018, at 9.20 p.m., in position 50 12 48N, 05 27 40.2W. The ship proceeded to an anchorage in the St. Ives Bay to investigate the problem and moored on March 27 at 1.40 a.m. After the problem was resolved, the ship continued the voyage with an ETA at Birkenhead as of March 28, 7.30 p.m.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data