General information

IMO:
9255488
MMSI:
211409100
Callsign:
DEEI
Width:
28.0 m
Length:
178.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Tankship
Ship type:
Flag:
Germany
Manager:
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
213.7° / 0.0
Heading:
216.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
North Sea
Last seen:
1 min ago
Source:
T-AIS
Destination:
ETA:
Max Draught:
Last drought:
Last update:
4 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2019-06-15
2019-06-17
1d 17h 26m
2019-05-31
2019-05-31
33m
2019-05-29
2019-05-30
1d 9h 9m
2019-05-29
2019-05-29
48m
2019-05-26
2019-05-28
2d 3h 54m
2019-05-12
2019-05-12
25m
2019-05-10
2019-05-12
1d 16h 47m
2019-05-10
2019-05-10
2h 2m
2019-05-05
2019-05-07
2d 1h 9m
2019-04-28
2019-04-30
1d 23h 53m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Skagen
2019-06-14
Leave
Skagen
2019-06-09
Enter
Terschelling
2019-06-08
Leave
Den Helder
2019-06-07
Enter
Ijmuiden Approach
2019-05-31
Enter
Amsterdam Breakwaters
2019-05-31
Leave
IJmuiden
2019-05-31
Leave
Note: All times are in UTC

Latest news

Allision in Arkhangelsk

Tue May 31 16:38:05 CEST 2016 Timsen

On May 29, 2016, the "Seahake" allided with the quay of berth 17 while mooring at the Oil Terminal in Arkhangelsk port. The ship hit with the aft starboard and damaged cargo piled up on the shore. Therre was no damage to the tanker. On May 30 a technical examination and repair of the affected loading arms was carried out.

Engine trouble in the Kiel Canal

Tue Oct 23 10:08:53 CEST 2012 Timsen

On Oct 22, 2012, the "Seahake" while enroute Wilhelmshaven Vysotsk suffered problems with its cooling water system at 11.25 p.m. while sailing eastbound in the Kiel Canal. The engine failed short before reaching the Brunsbüttel road bridge so that the tug "Bugsier 17" had to be called which moored the ship at Kudensee for repairs. After repairs were completed, the ship resumed its voyage and entered the Kiel Holtenau locks on Oct 23 at 6.20 a.m.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data