General information

IMO:
9561356
MMSI:
219018172
Callsign:
OWMN2
Width:
31.0 m
Length:
112.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
High-Speed Craft
Ship type:
Flag:
Denmark
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
28.5° / 0.0
Heading:
30.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
Belte and Sunde
Last seen:
2024-03-28
1 min ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
3 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-03-28
2024-03-28
31m
2024-03-28
2024-03-28
34m
2024-03-28
2024-03-28
46m
2024-03-27
2024-03-28
9h 30m
2024-03-27
2024-03-27
37m
2024-03-27
2024-03-27
53m
2024-03-27
2024-03-27
31m
2024-03-26
2024-03-27
8h 2m
2024-03-26
2024-03-26
40m
2024-03-26
2024-03-26
35m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Helsingborg
2023-02-14
Leave
Landskrona
2023-02-14
Leave
Oresund Bridge
2023-02-14
Leave
Oresund Bridge
2023-01-28
Enter
Landskrona
2023-01-27
Enter
Helsingborg
2023-01-27
Enter
Helsingborg
2023-01-14
Leave
Note: All times are in UTC

Latest news

Baby born on board

Mon Aug 08 10:48:33 CEST 2022 Timsen

On Aug 6, 2022, a baby was born aboard the 'Express 2' in the evening, shortly after the ferry had left Sjællands Odde heading for Aarhus, with the assistance of two doctors and a student. After arriving in Aarhus, the family was taken to Aarhus University Hospital in Skejby, where both the mother and the newborn were reported to be safe. Video with captain's announcement: https://maritimedanmark.dk/?Id=48940

Docking manoever in Ebeltoft aborted

Mon Aug 19 11:08:25 CEST 2019 Timsen

In the morning of Aug 17, 2019, the captain of the 'Express 2' aboarted its attempt to dock at the port in Ebeltoft after a mooring rope broke due to heavy wind gusts. Instead, the ship with nearly 650 passengers and about 250 cars on board, proceeded to Aarhus. In Ebeltoft, customers who had a ticket to sail to Seelands Odde, were encouraged to drive to the port of Aarhus instead.

Damage still being assessed

Mon Feb 19 18:16:34 CET 2018 Timsen

MAN Diesel was still analyzing the cause of the engine failure that put the "Express 2" out of operation on Feb 16. It was still uncertain when the engine would be repaired and therefore it was not clear when the "Express 2" can be reintroduced at Aarhus Odden. "MAN's technicians were still assessing the damage to the engine, so they could not really say anything about how extensive repairs and the time horizon would be.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data