The 'Shi Zi Feng' got stuck in the harbour channel while returning from the deep sea ship to the Chattogram port's jetty in the Karnaphuli river near the boat club on May 28, 2024, at around 1:15 p.m. The propeller was damaged when it allided with the Gupta buoy opposite of the Patenga container terminal due to a steering failure. A salvage vessel tried to refloat the vessel, which was not hampering the movement of ships in the port. Due to the Cyclone Remal, 19 ships, including the 'Shi Zi Feng', had been sent into the deep sea from the port jetty on the morning of May 26 after the Bangladesh Meteorological Department issued a distress signal number 9 for the port. As the weather became normal, the ships started returning at the jetty. Report with photo: https://www.tbsnews.net/bangladesh/chinese-flagged-vessel-gets-stuck-harbour-channel-while-returning-ctg-port-jetty-862566
News
CG SEA DRAGON
The US Coast Guard decommissioned the 'Sea Dog (WPB 87373)' and 'Sea Dragon (WPB 87367)' on May 29, 2024, during a ceremony in St. Marys, Georgia. Rear Adm. Douglas M. Schofield, Coast Guard District Seven commander, presided over the ceremony honoring the years of service the Coast Guard Cutters provided to the nation. The marine protector-class cutters assigned to Coast Guard Maritime Force Protection Unit Kings Bay in the Coast Guard’s Seventh District. The 'Sea Dragon' was commissioned in January 2008 and the 'Sea Dog' was commissioned in July 2009. Following the decommissioning ceremony, the cutters will be transferred to Marine Corps Air Station Cherry Point. The Coast Guard cutters 'Sea Devil (WPB 87368)' and 'Sea Fox (WPB 87374)' have relocated from Bangor, Washington, to replace the 'Sea Dog' and 'Sea Dragon'. Report with photo: https://www.news.uscg.mil/Press-Releases/Article/3788815/photo-release-coast-guard-cutters-sea-dog-sea-dragon-decommissioned-in-st-marys/
Kiel
The inauguration of the new shore power facility in Kiel on Dec 9, 2020, meant that Stena Line now have the possibility to connect 14 vessels at seven terminals with on-shore electricity during port stay. The new connection in Kiel will reduce the CO2 emissions from the two vessels Stena Scandinavica and Stena Germanica with 2,700 tonnes per year. In total Stena Line reduce its CO2 emissions with shore power with 13,000 tonnes per year. The new shore power facility in Kiel provides 100% green electricity, thus also avoiding NOX-, SOX- and particle emissions during the port stay of the 'Stena Germanica' and 'Stena Scandinavica'. Aside from Kiel, Stena Line have the possibility to connect to shore power supply at its two terminals in Göteborg, as well as in Karlskrona, Norvik, Trelleborg and Hoek van Holland, thus saving 13,000 t of CO2 per year in its network. Of the 36 vessels in the Stena Line fleet, 14 are now equipped with High Voltage Shore Connection systems (HVSC). “Shore power supply is important for us for two reasons: First, we want to have an immediate positive impact on the air quality in the ports we use. Secondly, we expect an even higher share of electrification in ports in the future – at cars, trucks, port vehicles and not the least at ships. With our battery and power bank projects, we develop our ferry services further in that direction constantly and we learn something new each day. In 2030 we expect to launch a 100 % battery powered and fossil free vessel”, say Niclas Mårtensson, CEO Stena Line and member of the Swedish Government Elelctrification Commission. Kiels mayor Dr. Ulf Kämpfer inaugurated the new façade of the shore power facility, which has been specially designed and illuminated. The inauguration marks the offizial start of the on-shore power supply for Stena Line in Kiel. The facility was co-funded by the state government of Schleswig-Holstein (8,9 m Euro) and the EU (1,26 m Euro). In addition, Germany´s federal government recently agreed on a political package to decrease the user prices for on-shore electricity significantly. “We are very grateful for the political support on various levels. The planned decrease of user prices for shore side electricity is an important step for the competitiveness of environmentally- and climate-friendly technologies in Northern Europe. At the same time, we are very happy about the continuous positive dialogue with our partners at Port of Kiel and the city of Kiel”, says Ron Gerlach, Managing Director, Stena Line Germany.
ELBEIK
On May 27, 2024, the port of Tarragona has finally been able to close the sale of the'Elbeik', which had caught fire on Aug 6, 2021, on the port's anchorage, for an amount of 88,000 euros to the company Eructa Shipping Inc. After two previous auctions that were successless, the sale puts an end to a process that began in August 2021 when the fire damaged ship was transferred to the extension of the Levante dock. where it has been docked and in a state of abandonment ever since. After the two previous auctions, the port of Tarragona had the option of carrying out a direct sale under special conditions that the ship met, such as the state of deterioration being very great, which poses a risk for its stay in the dock as it could sink, and that a year had passed since the last auction. In the last Board of Directors of the port of Tarragona, the award of the sale for an amount of 88,000 Euros to the Eructa Shipping Inc. was approved. Now the company has 20 days to make the payment and then sign the purchase and sale contract with the Authority. Port. Once this procedure is completed, the company will have one month to remove the ship from the Tarragona docks. Report with photo: https://www.elpuntavui.cat/societat/article/5-societat/2423196-el-port-de-tarragona-ven-l-elbeik-per-88-000-euros.html
CG-SEA-DOG
The US Coast Guard decommissioned the 'Sea Dog (WPB 87373)' and 'Sea Dragon (WPB 87367)' on May 29, 2024, during a ceremony in St. Marys, Georgia. Rear Adm. Douglas M. Schofield, Coast Guard District Seven commander, presided over the ceremony honoring the years of service the Coast Guard Cutters provided to the nation. The marine protector-class cutters assigned to Coast Guard Maritime Force Protection Unit Kings Bay in the Coast Guard’s Seventh District. The 'Sea Dragon' was commissioned in January 2008 and the 'Sea Dog' was commissioned in July 2009. Following the decommissioning ceremony, the cutters will be transferred to Marine Corps Air Station Cherry Point. The Coast Guard cutters 'Sea Devil (WPB 87368)' and 'Sea Fox (WPB 87374)' have relocated from Bangor, Washington, to replace the 'Sea Dog' and 'Sea Dragon'. Report with photo: https://www.news.uscg.mil/Press-Releases/Article/3788815/photo-release-coast-guard-cutters-sea-dog-sea-dragon-decommissioned-in-st-marys/
Puerto Brisa
Debido a la ola invernal y el paso del huracán IOTA, las vías al interior de la región de la alta guajira quedaron en mal estado, lo que no permitió el tránsito de camiones con alimentos y ayudas a la población indígena de esta zona. Por este motivo, a través de Puerto Brisa S.A. se llevó a cabo cargue de estos productos alimenticios y kits de ayudas humanitarias al buque de desembarco anfibio de la Armada Nacional, ARC GOLFO DE MORROSQUILO. De esta manera contribuimos al bienestar del pueblo guajiro, con la organización de los delegados del Programa Mundial de Alimentos de la ONU y ONG locales.
SEA FALCON
On the night of May 24, 2024, the “Sea Falcon”, en route from Caucedo, was in danger of sinking approximately 22 nautical miles south of Puerto Rico, while transiting toward the island of Tortola with four people on board, transporting two vehicles, construction materials, glass and a container with dry products. The US Coast Guard received a distress call from the captain, reporting that there was a crack in the ship's hull and that the estimated flooding rate was approximately 300 gallons per minute. The crew used water suction pumps that were not powerful enough to control the amount of water entering the ship. The USCG observers issued an UMIB to alert nearby vessel traffic of the danger and launched a Jayhawk helicopter to provide assistance at the scene and notified local marine units of the United Rapid Action Force (FURA) of the Puerto Rico Police. As the USCG helicopter arrived on scene, a rescue swimmer was deployed aboard the ship to assess the situation. He confirmed approximately three inches of water in the engine room due to a three-inch crack in the hull. Once a portable drain pump was installed, the rescue swimmer confirmed that the water level decreased to approximately two inches and the vessel could continue its voyage. The USCG helicopter crew later recovered their rescue swimmer and returned to Borinquen Air Station in Aguadilla. On May 28 at 11:48 a.m., the “Sea Falcon” safely arrived in Tortola.
ZELENGA
Representatives of the Western Interregional Investigative Committee for Transpor of the Russian Federation have opened a criminal case based on the allision of the 'Zelenga' with a railway bridge in Rostov for violation of traffic safety rules and operation of water transport․ While the ship's crew was not injured, the ship and part of the bridge suffered structural damages. The amount of damage to the owner of the ship and Russian Railwayswas more than a million Russian rubles. The cause of the accident was a failure of the steering control. The damaged vessel was towed out of the bridge and to a pier․ Trains can cross the bridge at a speed lower than usual․ Reports with photo and video: https://rtvi.com/visual/suhogruz-protaranil-zheleznodorozhnyj-most-cherez-don-foto-dnya/ https://e-nautilia.gr/rosiko-fortigo-ploio-prosekrouse-se-sidirodromiki-gefura-pou-trofodotei-tin-krimaia/#google_vignette
Banjarmasin
CV. DEARNI LESTARI MARINE SERVICES We can supply; 1. PROVISION STORES 2. BONDED STORES 3. CABINS STORES 4. GALLEY STORES 5. DECK STORES 6. ENGINE STORES 7. STATIONARY STORES 8. PUBLICATION STORES 9. ETC Technical jobs such as: 1. ELECTRIC MOTOR REWINDING 2. FABRICATING 3. TANK CLEANING 4. WELDING 5. ENGINE overhauling also available.
Paramaribo
The Maritime Authority of Suriname has issued the following 2 Notices to Mariners: 1. "From September 5, 2020 to January 6, 2021, the Noble Sam Croft drillship will conduct exploration drillings off the coast of Suriname at the drilling location 07 ° 23 "401 N - 55 ° 55" 264 W (WGS 84). For safety reasons the shipping should keep a safe distance of 1000 (one thousand) metres from thenNoble Sam Croft. The Offshore Support Vessels (OSV) that will assist during the operations are: Southern Tide, States Tide and Polaris. Please note: • Communication is through VHF, all international channels 13, 16, 69, 72. • There is a SAFETY ZONE of 1000 (one thousand) metres from the drilling site. • The Noble Sam Croft is not maneuverable and will display the relevant characters. All ships should take notice of the above mentioned." 2. "The drillship Maersk Developer will conduct exploration drilling of the Coast of Suriname from September 19th till December 3rd, 2020 at the drilling location 07° 21’.270 N – 055° 33’.247 W (WGS 84). For safety reasons vessels should keep a safe distance of 1000 (one thousand) meters from the drillship. The Offshore Support Vessels (OSV) that will assist during the operations are MV Bourbon Topaz, MV Gerard Tide, MV Felton Tide and MV National Energy Explorer. Please note: • Communication is through the VHF channels 16 and 77. • There is a SAFETY ZONE of 1000 (one thousand) meters from the drilling site. • Maersk Developer is not maneuverable and will display the relevant characters. All ships should take notice of the above mentioned."