Allgemeine Informationen

IMO:
MMSI:
211866190
Rufzeichen:
DJ9714
Breite:
10.0 m
Länge:
35.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Passenger ship
Ship type:
Flagge:
Germany
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Undefined
Kurs:
360.0° / -128.0
Kompasskurs:
511.0° / -128.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Kappeln (Kappeln)
Gebiet:
Germany
Zuletzt empfangen::
2024-05-16
vor 1 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 15 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-04-08
2024-05-07
28d 10h 22m
2023-11-22
2024-01-22
60d 16h 14m
2023-05-04
2023-11-21
200d 23h 32m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Geesthacht Ost
2023-11-22
Ankommen
Lauenburg
2023-11-22
Abfahren
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Old ferry re-installed due to ongoing problems with newbuilding

Tue Apr 23 10:20:41 CEST 2024 Timsen

Due to the ongoing problems with the 'Missunde III', the prececessor ferry “Missunde II” returned to operation on the Schlei. The State Office for Coastal Protection, National Park and Marine Protection (LKN) had already sold the old ferry for a scrap value of 17,000 Euros. During test operations, various problems arose when using the new, significantly larger ferry. The authority has now bought back the old diesel ferry for around 50,000 Euros. Since last week it has been operating again on its old route between Kosel and Brodersby. 3.3 million Euros were spent on the new ferry with electric propulsion and solar cells on the roof. The new ferry was originally scheduled to start operating in April 2023. But the transfer from the shipyard in Derben initially failed due to delivery difficulties, then due to low water on the Elbe and finally due to flooding on the Schlei. A January opening date was canceled due to additional work on the jetties. The new start date was March 2024. But further problems arose during test sailings which have shown that some modifications were necessary to the ferry's cable guide. The ferry can no longer be docked when the wind is three to four Beaufort. While the old ship, which is 21 meters long, has a load capacity of 22.5 tons, the new, 34 meter long ferry can transport 45 tons. so it is almost twice as big. The rope is obviously under heavy strain due to the greater weight. In order to be able to catch the much larger new ferry even in stronger winds and guide it safely to the ramps, additional thicker bollards are required. In order to be able to ram this, a soil report is first required. In addition, another rope will be laid through the Schlei. and the “Missunde III” will also receive bow and stern thrusters. Two rows of dolphins on the route across the Schlei are intended to make maneuvering the ferry easier. To do this, the fairway will have to be narrowed.

New ferry still troubled

Fri Mar 15 10:27:51 CET 2024 Timsen

The new Schlei ferry "Missunde III" cannot start operating as planned. The new concept clearly has design flaws. The ferry was supposed to start operating between Kosel (Rendsburg-Eckernförde district) and Brodersby (Schleswig-Flensburg district) in March 2024. According to ferry lessee Rüdiger Jöns, the new concept for the “Missunde III” obviously has design errors. It doesn't hook onto the feeder properly. The rope is also obviously under heavy strain due to the greater weight. The hope of a temporary solution with the old ferry “Missunde II” has also been dashed. The old ferry, which is in need of maintenance, is still on the Schlei and it was suggested that it be reactivated. However, the “Missunde II” no longer has a valid ferry certificate. The cost of getting it fit again for a certification would be 1.8 million Euros. On the other hand, the “Missunde II” has already been sold. The old ferry had already remained in operation longer than intended. The planned start was originally April 2023. Supply chain problems and low water on the Elbe during the transport of the new ferry from the shipyard to the Schlei delayed the delivery, and flooding on the Schlei delayed the renovations to the piers. The “Missunde II” received a temporary operating license until March 2024 to continue operating. However, operations have been suspended since January 2024. The ship is currently in Maasholm, but no longer owned by the Schleswig-Holstein State Office for Coastal Protection, National Park and Marine Protection. The deployment largely depends on whether the Technical Ship Safety Department of the General Directorate of Waterways and Shipping (GDWS) in Mainz is prepared to make a further compromise with regard to the ferry certificate. The 'Missunde II' was examined and approved in Oct 2023. There is currently a valid certificate in the form of a provisional ferry certificate. The ferry can therefore currently continue to operate until April 10, 2024. As soon as the defects identified during the examination have been corrected, the certificate can be extended. Regarding the “Missunde III”, operation should be tested with a lighter rope. The trials that have taken place over the last few weeks in various wind conditions have shown that some modifications were necessary to the ferry's cable guide. In addition, the ferry should be better guided with additional dolphins in order to improve the mooring maneuvers. However, a soil report and permits are still required for the piling work which will take a few more weeks. The 'Missunde III' is significantly larger than its predecessor and can carry significantly more weight. Instead of six, up to ten cars, even heavy vehicles such as coaches, tractors or trucks can be transported. Report with video: https://www.ndr.de/nachrichten/schleswig-holstein/Schleifaehre-Missunde-Politik-und-Anwohner-machen-Druck,missunde166.html

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data