Allgemeine Informationen

IMO:
7001965
invalid
MMSI:
269057418
Rufzeichen:
HE7418
Breite:
11.0 m
Länge:
135.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Passenger ship
Ship type:
Flagge:
Switzerland
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
281.0° / 68.0
Kompasskurs:
278.0° / 68.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
Austria
Zuletzt empfangen::
2023-11-08
vor 169 Tagen
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 196 Tagen
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2022-10-07
2022-10-11
4d 7h 33m
2022-08-12
2022-08-12
31m
2021-10-23
2021-11-08
15d 11h 45m
2021-09-24
2021-10-19
24d 15h 2m
2021-08-12
2021-09-23
41d 22h 15m
2020-12-19
2021-08-10
234d 1h 32m
2020-12-12
2020-12-19
7d 12h 8m
2020-11-11
2020-12-12
30d 14h 50m
2020-11-08
2020-11-11
3d 7h 39m
2020-08-25
2020-11-08
74d 19h 33m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Zelzate Bridge
2021-08-10
Ankommen
Spaarndam
2020-11-08
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Cruise continued after third incident within a month

Wed Sep 25 10:53:51 CEST 2013 Timsen

After the crane used to move the gangway of the "Viking Foreseti" was removed, the ship could continue its cruise from Budapest to Amsterdam in the foremidday of Sep 24. The crane had got out of proper position and hit an overhead power line over the Main-Danube Canal. The damage caused was around 40000 Euro. The impact had short-circuited the power lines and caused them to shut down. Several lines needed to be replaced. The highway and canal closures lasted until 1 p.m. The "Viking Forseti", which was launched only this year, was already involved in two previous accidents this month. It had run into the stern of another ship win a lock, then a second ship ran into it. No one was injured in either cases, but the accidents resulted in itinerary delays. In the actual case the ship was also delayed due to the inspections for damage at the shore. After a few hours it resumed its course. German report with photos: http://www.infranken.de/regional/forchheim/Kanalunfall-Forchheim-Das-bei-Forchheim-havarierte-Schiff-aus-der-Luft;art216,532709

River cruise ship blocked freeway A 73

Tue Sep 24 22:06:51 CEST 2013 Timsen

In the evening of Sep 23, 2013, at 7 p.m. the "Viking Forseti" hit a high voltage cable spanning the Main-Donau-Canal with its deck crane. The canal had to be closed for traffic at Forchheim, and the freeway A 73 was closed between Forchheim-N und Forchheim-S. The ship was underway with 180 passengers from Budapest to Amsterdam when it hit the cable which was 10 meters above the water, causing a short circuit and poer failure. The damage was 30.000 Euro. Only in the morning of Sep 24 technicians could start repairs.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data