The 'Solaris' was in collision with the 'Chaika' in St. Petersburg on the Neva under the Lyvarny Bridge on the evening of May 26, 2024. The "Solaris" hit the bow of the excursion ship and caused minor damage. No injuries were reported. The circumstances of the accident were being investigated by the St. Petersburg Transport Prosecutor's Office along with the water police.
News
ICON OF THE SEAS
A man was rescued after jumping into the sea from the 'Icon of the Seas' on the morning of May 26, 2024, as the ship sailed towards Roatan, Honduras, one day after departing from Miami, Florida, for a seven-night Western Caribbean cruise, approximately 40 miles north of Santa Lucia, Cuba. The vessel deviated its course to launch a rescue craft to locate the man overboard. An announcement was made stating that the man was recovered shortly after the rescue craft had been launched. He was in the ship’s intensive care unit with his family. The ship was due to arrive in the first port of call, Roatan, early on May 27. Report with photos: https://cruiseradio.net/man-in-critical-condition-after-jumping-from-worlds-largest-cruise-ship/
Beirut
The Port of Beirut (PoB) resumed partial operations on Aug 10 with the first two container ships berthing in the container terminal after the explosion which killed at least 160 persons, injured thousands and made hundred thousands homeless. Out of 16 cranes at the container terminal, 12 were currently operational. The port was gradually resuming operations to ensure the supply of all kinds of goods to citizens. Bassem Al Kaissi, the new Director of the PoB, said that the container terminal will be fully operational by Aug 14. Al Kaissi said that 420 containers were unloaded on Aug 10. The container terminal storage area has been cleaned up and restored to its state before the blast. The container terminal represents 80 percent of the overall cargo movement at the PoB. It is located one kilometer away from the blast epicenter. Container vessels can dock at quay number 16. Shipping movement at the PoB had already plunged by 75 percent due to the economic crisis and has reached 15 percent following the blast. Customs have opened offices in the PoB’s warehouse number 14 which was partially damaged. The customs have become able to carry out the inspection of merchandise- Customs duties are being temporarily paid at the Rafic Hariri International Airport. Tthe PoB is now handling only full containers as groupage consignment requires warehouses which don’t exist now. Amer Al Kaissi said groupage, which represents 15 percent of shipments at the PoB, will be diverted to the Port of Tripoli until the rebuilding of warehouses at the PoB is completed. The first two containerships to berth at the PoB after the blast were the 'Electra' (Gezairi Transport) and the 'Nicolas Delmas' (CMA CGM). The 'Electra', which was carrying 400 containers, was diverted to Tripoli where there was a license to operate but the company insisted to unload it in Beirut when it was told that the PoB has resumed operation. The CMA CGM Group and CEVA Logistics said they are fully operational and ensuring business continuity to serve their customers. The Group has redeployed its employees in its two back-up sites in Beirut Digital District and reinforced its presence in Tripoli. Part of CMA CGM’s vessels has been temporarily directed to Tripoli. Few shipping companies are authorized to operate in other ports such as Tripoli or Saida. BCTC, the Customs and the PoB’s authorities did their best to handle the clearing formalities despite the difficult working conditions. The general cargo area was fully operational on Aug 12 both for imports and exports. This includes wheat and other grains as well as construction steel bars. The cost of rebuilding the port is estimated at around $1 billion.
SALVAMAR ENIF
On May 27 at 1.59 a.m. the 'Salvamar Enif' rescued four North African migrants from a toy boat, which had been located 16 nautical miles southwest of Trafalgar. The castaways were disembarked in Algeciras/El Saladillo. The response was coordinated by the MRCC of Salvamento Maritimo in Tarifa.
MV MAA
The plan to promote tourism on the beachfront in Visakhapatnam by converting the 'Maa' into a floating restaurant still remained on hold. Though the State government had declared an allotment of Rs 10 crore for the project, it was yet to take some shape due to procedural wrangle in getting clearance from environmental point of view. The Andhra Pradesh Tourism Development Corporation (APTDC) had also tied up with Shore & Ship Resorts Private Repair Ltd. to make necessary alterations within the vessel at an estimated cost of Rs 15 crore. Green activists said that the continuation of the ship just close to Tenneti Park, a popular venue for the localities and tourists in the city, was an environmental risk. The State government explored various options to make the ship fit by redesigning to convert it into a restaurant as part of an effort to promote beach tourism. However, delay in getting clearances from the Ministry of Environment, Forests and Climate Change, clearance under the Coastal Regular Zone (CRZ) guidelines and other authorities turned the project jinxed. Report with photo: https://www.bizzbuzz.news/national/bid-to-convert-abandoned-bdesh-ship-into-floating-restaurant-turns-jinxed-1317293
COSTA TOSCANA
On May 27, 2024, the 'Costa Toscana' requested the medevac of a passenger 10 nautical miles East of Palamós. The CCS Barcelona of Salvamento Marítimo deplopyed the SAR boat 'Salvamar Sirius', which which placed itself next to the ship and embarked the patient, a family member and a nurse.
USAV MATAMOROS
On May 26, 2024, the USAV 'Matamoros' assisted in refloating a landing craft 'LCM 8558' that had grounded on the Ashdod shore on March 25. The landing craft had been working with the US-built floating pier off the coast. It was beached while assisting a US army tug that was helping move the floating pier from an area off the Gaza coast to near Ashdod due to adverse weather conditions with high swells of about 1.5 meters that emerged on May 23 and May 24, while winds gusted to some 20 knots, which necessitated moving the pier. The floating pier has been helping deliver humanitarian aid to Gaza. It was constructed after a decision in early March to deploy the unique US Army capability. The Joint Logistics Over-the-Shore capability was deployed beginning in mid-March with several vessels sailing from Fort Eustis across the Atlantic via Crete to the coast of Gaza. It began operations in mid-May. On the evening of Maya 23, several vessels involved with moving the pier broke free from their moorings. The tug was beached on Ashdod Beach, a hundred meters north of a lifeguard stand near an area called Beersheba Beach. The 'LCM 8558' tried to help the tug, but became stranded on the beach near the tug with the low tide. It had to be dug out with a front-loader. The US had been trying to free the LCM and the tug since May 25. The USAV 'Matamoros' arrived on the afternoon. It connected a rope to the LCM. On May 26 by midday the LCM was ready to be pulled off. The tide remained an issue because the low tide was around 6 p.m. Around 9 p.m. the LCM was pulled off the beach, with the hope that it would remain free of the sand. The goal was then to pull the tug off the beach. Then, the vessels will all be united with the floating pier and likely return to the coast of Gaza so humanitarian aid can be delivered again. The Israel Navy assisted in the efforts to free the ships. Report with photos: https://www.jpost.com/israel-hamas-war/article-803750
Kiel
The PORT OF KIEL has redesigned the port apron in Ostuferhafen, which is the freight and logistics centre on the fjord. Where once stood a grain silo, there is now an expanded pre-stacking and stand-by area of three hectares for trucks, trailers and pas-senger cars.The State Premier of Schleswig- Holstein, Daniel Günther, visited the Ostufer-hafen on 12th August to hand over the grant notice coming from the State Programme Economy for 5.44 million Euros: The project to redesign the port apron included dismantling three hall areas of the former grain silo, excavation and road works as well as drainage, lighting and security measures and the connection of the area to the infrastructure. Through the new and generous port apron it has been possible to merge formerly separated pre-stacking areas, shorten distances and gain more space for trucks, busses, trailers and passenger cars. Furthermore, IT solutions have been developed to accelerate the handling processes at the gate, which also allow truck drivers to reduce personal contact.Dr Dirk Claus, Managing Director at the PORT OF KIEL: “Even under the current circumstances the Ostuferhafen operates in a reliable and safe way. The port of Kiel has proven its systemic importance regarding the transshipment of cross-border freight transport.”In the first seven months of the year 2.1 million tons of cargo have been tran-shipped via the Ostuferhafen (+ 1 %). Additional volumes have been transported by the ferries of the DFDS shipping company to the Baltic States or they have been delivered by the SCA-RoRo-freighters from Scandinavia. Not only general cargo and forest products are unloaded resp. transhipped in Ostuferhafen but also project and heavy cargo, scrap metal and agricul-tural products. The integrated passenger terminal to handle cruise vessels emphasizes the universal character of this port part.