Beached at Chittagong 26.04.24
News
Ashdod
The Israel-Palestine conflict has crept into the maritime sector. The two Israeli ports Ashdod and Ashkelon had to be closed after rocket attacks on port infrastructure as well as other port complexes in the region. Vital Israeli port infrastructures in the Ashdod and Ashkelon area were hit in spite of the air defense system iron dome. The port of Ashdod siffered widespread damage. The cargo ships 'Mona' (IMO: 9101534) and 'Ahmet Onel' (IMO: 8420361), were nearly hit by rockets. In a separate incident, the military wing of Hamas - the Izz ad-Din al-Qassam Brigade - has declared that they have bombed an Israeli Gas Platform off Gaza, which has been continuing to burn ever since.
Lüneburg
- there is an access control system for the port: registration at www.hafen-lueneburg.de - special services: drinking water, shore power, acceptance of domestic sewage, acceptance of washing water on request
PAPUA JAYA 02
Rescuers from Timika, Central Papua, launched an SAR operation on April 25, 2024 after Muhammad Royani (43), a crew member of the 'Papua Jaya 02' was reported missing, after the vessel's skipper, Muhammad Hidayat, could not find him during breakfast on the morning. Royani may have fallen into the sea while defecating around 3 a.m. LT on April 24. Before calling for the Timika SAR Agency's help, the crew members tried to search for Royani around the Timika waters that the vessel had passed through earlier. After they failed to locate him, Hidayat decided to ask the SAR agency to help. Report with photo: https://en.antaranews.com/news/311814/search-on-for-missing-mv-papua-jaya-2-crew-sar
ISLE OF ARRAN
The scheduled arrival in Brodick, Arran, on April 25, 2024, at 4.15 p.m. of the 'Isle of Arran' was delayed as it participated in an SAR operation and launched a fast rescue crraft. Also the Coastguard scrambled helicopters from Inverness and Stornoway, and RNLI lifeboats from Troon and Arran also rushed to the scene in the Firth of Clyde near Ardrossan. An RAF Poseidon plane was mobilized too. A fishing boat sank after smashing into a tanker between Ardrossan and Arran at around 3 p.m. The ‘RNLB Jim Moffat’ from Troon recovered the castaways from a liferaft. With initial casualty care being carried out by the volunteer lifeboat crews, the Troon lifeboat made best speed back to Troon to meet with the other partner emergency services at the lifeboat station. Once back at the lifeboat berth, the casualties were handed over to the care of the ambulance service and coastguard teams, and the lifeboat crew made the all-weather lifeboat ready for service with the assistance of the shore crew. The Marine Accident Investigation Branch, Police Scotland and MCA Survey and Inspection teams have been informed. Report with photos: https://www.thescottishsun.co.uk/news/12550368/three-rescued-from-sinking-fishing-boat-after-horror-firth-of-clyde-crash/
Thyboron
On May 6, 2021, at 10 a.m. a trawler newbuilding caught fire in Thyborøn. The 'L 120-Linette' was ablaze at the shipyard quay. The fire brigade, police and the lifeboat 'Martha Lerche' of the DSRS were on site. Bundles of flames shot out of the ship, and there was heavy smoke development. The fire had started in the cargo hold when insulation material went alight. Not until May 7 at 2 a.m. the emergency services managed to extinguish the flames on the vessel. The temperatures inside the ship were extremely high. The construction of the trawler began in 2020. Alfred Fisker Hansen and Tommy Svart had ordered the trawler in Vestværft design. The hull was built in Poland and then towed to Thyborøn where it was completed at the Thyborøn Skibs & Motor. The completion in June should now be obsolete. The predecessor ship of the same name is to go to Sweden. The new building is 28.6 meters long and 8.7 meters wide with a planned crew of eight with one trainee. Report with photo and video: https://www.tvmidtvest.dk/lemvig/skib-i-flammer-paa-havnen-i-thyboroen-politiet-opfordrer-til-at-lukke-vinduer-og-doere
Beirut
The French container giant CMA CGM is working on a plan to rebuild the port of Beirut within three years. Political stalemate in Lebanon has meant that no decisions have been made after the huge explosion that killed 200 in 2020. CMA CGM first presented the plan to the Lebanese authorities in September, which includes the reconstruction of damaged quay facilities and warehouses, along with a port expansion and digitization. The total price was estimated to be between 400 and 600 million. dollar. Another offer was announced on April 9, 2021. German companies presented a multi-billion dollar plan to rebuild the port and surrounding districts, which was also devastated by the violent explosion.
LU ZHOU
Beached at Chittagong 06.04.24 https://www.facebook.com/photo/?fbid=922708242980055&set=a.518272956756921
Brake
on 01.05.21 J.Müller celebrate the 200th anniversary of the company German report: https://jmueller.jp-labs.de/jubilaeum/
Papenburg
The Meyer shipyard located in Papenburg, Germany, announced, they secured an order for a new cruise ship. The new customer is NYK who placed an order for a medium size cruise ship for their brand Asuka Cruises. Full article + image: https://www.cruisedeck.de/meyer-werft-sichert-sich-neubau-auftrag/