General information

IMO:
MMSI:
Callsign:
3EZP5
Width:
50.0 m
Length:
241.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Tankship
Ship type:
Flag:
Panama
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
0.0° / 0.0
Heading:
69.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Singapore (Keppel Shipyard East Berth Area 01)
Area:
Strait of Singapore
Last seen:
2017-06-13
2509 days ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
2509 days ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
-
-
-
-
-
-
-
-
-
-

Latest Waypoints

Waypoints
Time
Direction
-
-
-

Latest news

BW Offshore: BW Catcher commenced transit to the North Sea

Mon Aug 28 11:18:47 CEST 2017 arnekiel

BW Offshore is pleased to announce the sail away of the FPSO BW Catcher. The vessel has left Keppel Shipyard in Singapore and is currently in transit to the Catcher field in the central North Sea. BW Catcher is expected to reach UK waters early in the fourth quarter, depending on prevailing weather conditions.

Catcher FPSO on sea trials before sailaway

Sun Aug 20 07:49:47 CEST 2017 arnekiel

BW Offshore-owned floating production storage and offloading (FPSO) vessel BW Catcher, built for Premier Oil-operated Catcher development in the UK sector of the North Sea, is undergoing marine trials in Singapore ahead of its departure to final offshore location. Earlier this week, Premier Oil launched a video of the FPSO starting its marine trials off Singapore. The unit is scheduled to leave the shipyard and head to the UK this month. The FPSO was built by Keppel’s shipyard where a naming ceremony was held in April. The vessel is 241 meters long, 50 meters wide and 27 meters deep and it will be able to process up to 60,000 barrels of oil a day. The Catcher development, made up of several fields discovered between 2010 and 2013, is located 170 kilometers south-east of Aberdeen. The development entails 22 subsea wells, 14 producers and 8 water injectors, on the Catcher, Varadero and Burgman fields which will be tied back to the leased BW CATCHER FPSO. Upon completion, the vessel will be on a seven-year fixed term and 18 years of options contract with Premier Oil. At the end of July Premier Oil was working to complete the last of twelve wells scheduled for completion pre-first oil and the project remains on track for start-up in 2017. source: Offshore Energy Today Staff

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data