General information

IMO:
9733961
MMSI:
477730700
Callsign:
VRPE3
Width:
60.0 m
Length:
333.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Tankship
Ship type:
Flag:
Hong Kong
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
213.8° / -3.0
Heading:
209.0° / -3.0
Speed:
Max speed:
Status:
moving
Area:
Persian Gulf
Last seen:
2024-04-28
1 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
3 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-04-02
2024-04-04
2d 3h 1m
2024-03-26
2024-03-28
2d 3h 5m
2024-02-14
2024-02-18
3d 22h 34m
2023-10-19
2023-10-20
1d 13h 14m
2023-09-10
2023-09-11
1d 54m
2023-08-23
2023-08-24
1d 1h 11m
2023-07-26
2023-07-29
2d 21h 48m
2023-06-11
2023-06-14
3d 5h 3m
2023-04-14
2023-04-20
5d 10h 2m
2022-12-11
2023-01-06
26d 3h 2m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Strait of Hormuz
2024-04-27
Enter
Malacca Straits - Penang Island
2024-04-11
Enter
Malacca Straits - Port Klang
2024-04-11
Enter
Kukup Island
2024-04-10
Enter
Malacca Straits - Penang Island
2024-01-11
Enter
Malacca Straits - Port Klang
2024-01-11
Enter
Kukup Island
2024-01-10
Enter
Note: All times are in UTC

Latest news

DHT Leopard among tanker series with rudder trouble

Fri Dec 16 09:04:08 CET 2016 Timsen

Studies have revealed meter-long cracks in the helm of several newly built supertankers from the South Korean shipyard Hyundai Heavy Industries. The cracks - believed to be the result of a design fault - now lead to 35 supertankers to be examined for similar errors. The problem became known four months ago when DHT Holdings routinely examined six of its supertankers within the warranty period. They found meters long cracks in the helm of the DHT Jaguar", the first ship in a series of six identical supertankers delivered by HHI. Similar faults were subsequently found on the other two supertankers from the same series. The "DHT Jaguar" and "DHT Leopard" have been in the shipyard for repairs, while a third tanker was still under construction at the shipyard. Hyundai Heavy Industries have built a total of 35 supertankers of that type, but with different rudder cconstructions. All ships will now be examined. In addition to DHT Holdings Gener8, Euronav and Frontline have supertankers of that type, who have all been informed of the problem. Several owners have investigated ships without problems, while others have found faults that now must be repaired.

DHT Holdings takes delivery of VLCC DHT Leopard

Tue Jan 05 13:01:41 CET 2016 arnekiel

Crude oil tanker shipper DHT Holdings, Inc. has on Jan. 4, 2016 taken delivery of a newly built 299,900 dwt very large crude carrier (VLCC) from Korean shipbuilder Hyundai Heavy Industries. The new ship, DHT Leopard, will enter the spot market as the second vessel in a series of six fully funded VLCC newbuilds to be delivered to DHT from November 2015 to October 2016.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data