General information

IMO:
9778143
MMSI:
205708000
Callsign:
ORSB
Width:
26.0 m
Length:
116.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Dredger
Ship type:
Flag:
Belgium
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Restricted movement
Course:
272.7° / -5.0
Heading:
269.0° / -5.0
Speed:
Max speed:
Status:
moving
Area:
North Sea
Last seen:
2024-04-27
1 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
11 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-04-25
2024-04-25
1h 4m
2024-04-23
2024-04-25
1d 7h 56m
2024-04-23
2024-04-23
34m
2024-04-22
2024-04-22
10m
2024-04-22
2024-04-22
11h 15m
2024-04-14
2024-04-14
1h 16m
2024-04-14
2024-04-14
1h 25m
2024-04-14
2024-04-14
43m
2024-04-12
2024-04-12
35m
2024-04-12
2024-04-12
1h 46m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Zeebrugge Breakwaters
2024-04-26
Leave
Zeebrugge Breakwaters
2024-04-26
Enter
Zeebrugge Breakwaters
2024-04-26
Leave
Zeebrugge Breakwaters
2024-04-26
Enter
Zeebrugge Breakwaters
2024-04-26
Leave
Zeebrugge Breakwaters
2024-04-26
Enter
Zeebrugge Breakwaters
2024-04-25
Leave
Note: All times are in UTC

Latest news

First Delivery by Titan LNG in German Port of Mukran

Wed Nov 07 10:37:24 CET 2018 arnekiel

DEME’s dredger Scheldt River was refuelled from 7 LNG trucks. Titan LNG, the leading LNG supplier to marine and industrial users in North West Europe, has successfully completed the first-ever LNG bunker delivery at Mukran Port on the island of Rügen in the Baltic Sea. Truck deliveries enable delivery of LNG anywhere. For vessels that require LNG it is possible to be supplied in German ports at prices below the price of marine gasoil.

Dredger caused oil spill in the Elbe

Wed Aug 15 16:25:52 CEST 2018 Timsen

On Aug 15, 2018, around 1 a.m. the "Schldt River" caused a small oil spill in the Elbe estuary at the height of buoy 53. After the hydraulic hose of the dredger arm broke, the oil was spilt. Most of the oil could be recovered by the crew, but an estimated amount of 150 liters was lost. An oil surveillance flight was launched from Nordholz to monitor the surrounding area. The crew detected a pollution of 2,4 kilometers length and 300 meters width. The police launched an investigation against the39 year old master of the dredger which was working on fairway maintenance between Cuxhaven and Wedel.

DEME Names Second LNG-Fueled Dredger

Mon Oct 02 10:36:30 CEST 2017 arnekiel

The Trailing Suction Hopper Dredger ‘Scheldt River’, was officially named today (Oct. 1) at the DEME head office in Zwijndrecht, Belgium. The dredger was named by Mrs Veerle Hegge, the wife of Mr Bart De Wever, Mayor of Antwerp.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data