General information

IMO:
8707446
MMSI:
273426890
Callsign:
UBFR7
Width:
18.0 m
Length:
125.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Fishing Boat
Ship type:
Flag:
Russia
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
176.8° / -2.0
Heading:
318.0° / -2.0
Speed:
Max speed:
Status:
moored
Location:
Area:
Russia
Last seen:
2024-04-29
4 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
7 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-03-26
34d 2h 28m
2024-02-09
2024-02-09
12h 59m
2024-01-17
2024-01-25
8d 11h 24m
2024-01-10
2024-01-13
2d 6h
2024-01-03
2024-01-06
3d 23m
2023-08-11
2024-01-03
144d 22h 7m
2023-07-05
2023-08-08
34d 4h 13m
2023-06-28
2023-07-05
6d 13h 9m
2023-05-20
2023-06-28
39d 5h 32m
2023-05-15
2023-05-20
4d 13h 56m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Kukup Island
2018-12-31
Leave
Malacca Straits - Port Klang
2018-12-31
Leave
Malacca Straits - Penang Island
2018-12-30
Leave
Malacca Straits - North
2018-12-29
Enter
Banda Aceh
2018-12-29
Leave
Jeddah North
2018-12-18
Enter
Jeddah South
2018-12-18
Enter
Note: All times are in UTC

Latest news

Greenpeace blocked Jan Maria off Ijmuiden

Fri May 24 18:03:40 CEST 2013 Timsen

Greenpeace activists on May 23, 2013, have prevented the "Jan Maria" from docking in the port of IJmuiden. The ship made after several dangerous maneuvers and finally turned back when it was confronted with three boats of the activists of Greenpeace who suspect illegal fishdumping. The ship moved on to the quay of Daalimpex in Velsen-North. According to the owner, the blockade by Greenpeace caused only a few hours delay. Attaching a large banner on the hull was unsuccessful and an activist fell into the sea. He could be saved, but Parlevliet called it an irresponsible action. Dutch report with photo and video: http://www.happynews.nl/2013/05/24/greenpeace-belet-monsterschip-toegang-tot-haven-ijmuiden/

Police ended Greenpeace operation

Tue Jan 03 22:10:04 CET 2012 Timsen

In the foremidday of Jan 3 the "Jan Maria" was free agaín and entered the sea lock of Bremerhaven. Chains which had blocked the propeller were removed by divers before. The water police escorted the vessel to open waters. Three swimmers had still tried to block the ship in the morning while it attempted to depart from the port. The police pulled them out of the water. In the afternoon the ship was underway to fishing grounds. German report with photos: http://www.radiobremen.de/politik/nachrichten/politikfischfanggreenpeace100.html

Trawler blocked by Greenpeace

Mon Jan 02 18:22:54 CET 2012 Timsen

The Jan Maria" was blocked by Greenpeace activists in the morning of Jan 2, 2012, in Bremerhaven and thus kpet from sailing. A chain was pulled through the propeller and some activists fastened themselves at the mooring lines. They had already protested on Dec 23 against the ship because of its oversize. German report with photo: http://www.radiobremen.de/politik/nachrichten/politikfischfanggreenpeace100.html

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data