Caledonian MacBrayne announced further delays to the return of the 'Caledonian Isles', which will be out of action until the end of August. The vessel was deemed unfit to return to service during its annual inspection at the Cammell Laird Yard in Birkenhead in January, leaving the main means of crossing between Ardrossan and Brodick relying on a single, smaller ship, the 'Isle of Arran'. In February, the ferry operator insisted the 'Caledonian Isles' would return in June, but this has now been revised until at least the end of August. The scope of repairs will take significantly longer than anticipated. The steel repair work required is understood to involve removing all the engines at a cost of £5 million. As part of the works, the auxiliary engines and their bedplates were removed from the vessel to allow access to the double bottom water ballast tank tops. The structure below the main engines is being supported using hydraulic jacks, whilst the steel around these engines is renewed. The main engines will need to be lifted off their bedplates to allow access under the engines for renewal of the tank top steel directly below the sump.
News
DALI
One month after the allision of the 'Dali' with the Francis Scott Key Bridge in Baltimore, four bodies have been recovered, over 1,300 tons of steel have been salvaged, and three temporary channels have opened. Access to the Port of Baltimore remained limited since the collapse, and a complex salvage effort is underway in the Patapsco River. Support programs are underway to assist the thousands of workers impacted by the were . Since the collapse, the FBI and NTSB have launched separate investigations into the incident and Baltimore City announced a lawsuit against the owners and managers of the ship. The U.S. Army Corps of Engineers is leading the salvage effort. Its priority was to clear the main channel through the river to reopen access to the Port of Baltimore. Massive floating cranes were being used as wreckage and debris removal continues. Engineers have to break the mangled bridge into smaller pieces to lift them away, and Navy sonar images revealed wreckage in the deepest part of the channel. The rubble and debris are going to nearby Sparrows Point for processing and recycling. The progress has enabled the opening of three temporary channels for some ships to get in and out of the Port of Baltimore. On April 20, the third temporary channel opened on the northeast side to allow commercial vessels some access to the port, allowing about 15 % of the pre-collapse vessel traffic through as part of a phased approach to opening the river's main channel, which spans 700 feet, by the end of May, restoring port access to normal capacity. The 'Dali' remained pinned under tons of steel at the crash site, and removing more shipping containers from the vessel remained essential to move the ship. Engineers aimed to remove 140 containers to refloat the Dali; 120 containers were removed as of April 19. The 'Dali''s crew of 22 have remained on the ship since the accident. They do not have the appropriate visas to leave the ship, so they rely on organizations to bring them essentials. Officials have been in communication with the crew, as well as the crews aboard other cargo ships stuck in the port. All were in good health. The men killed in the Key Bridge collapse were working for Brawner Builders, filling potholes on the center span of the bridge. Most were immigrants, but all were Marylanders. As a memorial grows on Fort Armistead Road for the six men killed in the accident, recovery efforts to locate the two workers still missing under the wreckage were ongoing. They have been identified as Miguel Luna, of El Salvador, and Jose Maynor Lopez, of Guatemala. Three of the victims recovered were identified as: Dorlian Cabrera, 26, who was originally from Guatemala and lived in Dundalk; Alejandro Hernandez Fuentes, 35, who lived in Baltimore and was from Mexico; and Maynor Yasir Suazo-Sandoval, 38, of Guatemala. A fourth body who was recovered last week has not been identified at the request of his family, but he was known to be from Mexico. Both the National Transportation Safety Board and the Federal Bureau of Investigation launched probes into the crash. The NTSB investigation focused on the ship's electrical system, as it had lost power and the ability to steer before the collapse. The agency expected the preliminary report on the collapse to be released by the first week of May. When the FBI launched its investigation, it confirmed it had agents on the ship who were conducting court-authorized law enforcement activity. Baltimore City is suing the owners and managers of the 'Dali', claiming the owners of the ship were negligent in letting the vessel leave the Port of Baltimore without failing to fix known power problems. Perhaps anticipating a wave of lawsuits, the companies that own and manage the ship took steps about a week after the collapse to limit their legal liability. Local, federal and community resources continued to pour in to support the port workers, victims' families and others impacted by the collapse. The disaster affected 15,300 jobs directly related to port activity, but overall about 140,000 people have been impacted. Federal grants were freed up for dislocated workers to help replace jobs affected by the collapse. The government also allocated $8 million in grant funds for infrastructure improvements at Sparrows Point, the only port unaffected by the collapse. Two weeks after the collapse, Gov. Moore signed the PORT Act, which allows the governor to use up to $275 million from the state's rainy day fund to offset wage losses for those impacted by the closure and reduced operations at the Port of Baltimore. The Port of Baltimore Worker Support Program provides temporary relief to Port workers who have lost work and income. The Small Business Administration has also opened recovery centers to assist small businesses. Applications are open for the Port Business Wage Subsidy program, which is administered by the Baltimore City Mayor's Office of Employment Development. It will grant $1 million in wage subsidies to help businesses at the port pay their employees. The WJZ has partnered with The United Way of Central Maryland on the Bridging the Gap Fund to support eviction prevention, food access, and other needs. Maryland also launched a website centralizing assistance for those impacted by the collapse. A fourth temporary channel was scheduled to open at the Port of Baltimore on April 25. It will only be open for four days, but at 35 feet deep and 300 feet wide it will allow several ships that are stuck in the Port of Baltimore to get out. There were seven ships ready to get out of the port. Five will be able to get out, including a loaded car-carrier.
Ashdod
The Israel-Palestine conflict has crept into the maritime sector. The two Israeli ports Ashdod and Ashkelon had to be closed after rocket attacks on port infrastructure as well as other port complexes in the region. Vital Israeli port infrastructures in the Ashdod and Ashkelon area were hit in spite of the air defense system iron dome. The port of Ashdod siffered widespread damage. The cargo ships 'Mona' (IMO: 9101534) and 'Ahmet Onel' (IMO: 8420361), were nearly hit by rockets. In a separate incident, the military wing of Hamas - the Izz ad-Din al-Qassam Brigade - has declared that they have bombed an Israeli Gas Platform off Gaza, which has been continuing to burn ever since.
Lüneburg
- there is an access control system for the port: registration at www.hafen-lueneburg.de - special services: drinking water, shore power, acceptance of domestic sewage, acceptance of washing water on request
OASIS OF THE SEAS
A 74-year-old female passenger from Belgium caused the 'Oasis of the Seas' to return to Bermuda on April 24, 2024, at 5 a.m. The ship, which en route from Miami, Florida to Cadiz, arrived in local waters at 1 a.m. to drop off a 69-year-old passenger from the USA, who needed medical attention. The passenger was taken to Ordnance Island and escorted safely to KEMH.
NORWEGIAN SKY
Two men, Pascal Bosman of the Netherlands and Martire Cabrera of the Dominican Republic, who arrived in Tortola aboard the 'Norwegian Sky' on April 19, 2024, have been reported missing, as neither man returned to the cruise ship for departure. Local authorities were asking for the public’s help in locating the missing men, and have noted that neither one has departed the territory in any legal means that would involve their paperwork being officially documented. The Government of the Virgin Islands Immigration Department has asked the public for assistance in locating the men. Anyone with information about either man should contact the Department of Immigration or the Royal Virgin Islands Police Force. No details about the men or the circumstances by which they are now missing have been released, other than the fact that Cabrera is carrying a St. Kitts & Nevis passport. The 'Norwegian Sky' was in Tortola from approximately 6:30 a.m. until 2:15 p.m. on April 19. The British Virgin Islands was the last port of call before the ship returned to La Romana in the Dominican Republic, where the vessel had set sail from on April 10 for the 10-day Caribbean cruise. The ship had previously visited a variety of destinations, including Aruba, Curacao, Barbados, St. Lucia and Antigua. There have been no reports from family members or other concerned individuals about either of the missing men, and it was not known whether or not they were traveling together or had some other connection to one another. The men debarked the ship in Tortola, but failed to return to the vessel before its scheduled departure. In the days since, they have not been seen nor have they been recorded leaving the island by any other legal means, such as via air travel. Just a month ago, also in Tortola and also from Norwegian Sky, three passengers – two women and one man – failed to return to the ship and were reported missing in the same manner. While all three were from Colombia, it is not known whether they were traveling together or involved with one another. Report with photos: https://www.cruisehive.com/two-cruise-passengers-reported-missing-in-the-british-virgin-islands/129774
Thyboron
On May 6, 2021, at 10 a.m. a trawler newbuilding caught fire in Thyborøn. The 'L 120-Linette' was ablaze at the shipyard quay. The fire brigade, police and the lifeboat 'Martha Lerche' of the DSRS were on site. Bundles of flames shot out of the ship, and there was heavy smoke development. The fire had started in the cargo hold when insulation material went alight. Not until May 7 at 2 a.m. the emergency services managed to extinguish the flames on the vessel. The temperatures inside the ship were extremely high. The construction of the trawler began in 2020. Alfred Fisker Hansen and Tommy Svart had ordered the trawler in Vestværft design. The hull was built in Poland and then towed to Thyborøn where it was completed at the Thyborøn Skibs & Motor. The completion in June should now be obsolete. The predecessor ship of the same name is to go to Sweden. The new building is 28.6 meters long and 8.7 meters wide with a planned crew of eight with one trainee. Report with photo and video: https://www.tvmidtvest.dk/lemvig/skib-i-flammer-paa-havnen-i-thyboroen-politiet-opfordrer-til-at-lukke-vinduer-og-doere
Beirut
The French container giant CMA CGM is working on a plan to rebuild the port of Beirut within three years. Political stalemate in Lebanon has meant that no decisions have been made after the huge explosion that killed 200 in 2020. CMA CGM first presented the plan to the Lebanese authorities in September, which includes the reconstruction of damaged quay facilities and warehouses, along with a port expansion and digitization. The total price was estimated to be between 400 and 600 million. dollar. Another offer was announced on April 9, 2021. German companies presented a multi-billion dollar plan to rebuild the port and surrounding districts, which was also devastated by the violent explosion.
ODYSSEY OF THE SEAS
The 'Odyssey of the Seas' diverted to Bermuda on April 23, 2024, to drop off a 31-year-old male crew member who required medical attention. The ship, which was on its way from Fort Lauderdale, Florida, to Ponta Delgada in the Azores, arrived in local waters at 7 p.m., and the Indonesian crew member was taken to Ordnance Island by the pilot and rescue boat 'St George' and transported by ambulance to King Edward VII Memorial Hospital.
NORWEGIAN PRIMA
An accident report by the traffic accident investigation committee found out that the 'Norwegian Prima' with 4,600 passengers on board was only about 10 meters away from running aground off the island of Viðey on May 26, 2023, after it had gone off course in a storm and the captain had apparently underestimated the situation. The crew of the tug 'Magni' did everything in their power to prevent a major accident. According to the report, the ship had left the Sundahöfn cruise port in Reykjavík on the evening with the assistance of the tug 'Magni'. A strong wind was blowing from the southwest. The pilot recommended that the captain delayed the departure. The captain decided to stick to the schedule, despite the weather and against the pilot's recommendation. The ship had to be turned around before it could head out to sea. Shortly after the turn, strong gusts of 50 knots came in from the west. At the same time, the captain increased the speed. The ship drifted with the wind eastwards toward the shallows while the tug pulled against it at full speed. At the outer edge of the shipping channel, the 'Norwegian Prima' drifted over a buoy, and it was very lucky that a chain hanging from the buoy did not get entangled in the ship's propeller. It was already clear that the ship was way off course and was in great danger of running aground. The captain, who was sailing into Reykjavík harbor for the first time, tried to countersteer with the ship's propellers, but that wasn't enough. The report stated that only ten meters separated the ship from shoals that would have left less than half a meter of space for the keel. The tug had to be repaired after the incident, but the cruise ship remained undamaged. The report contains recommendations on how such incidents can be prevented. Among other things, there is a recommendation for the shipping company to evaluate all information to supplement its own risk assessment. It is also recommended that the Port of Faxaflói update its workflows to ensure good communication between tugs and pilots. This communication must be in English and understandable to everyone. The government is being asked to extend the powers of pilots so that they can refuse ships to leave under certain circumstances. Finally, the report proposes a risk assessment for all ports where passenger ships anchor. Full report with photos: https://www.rnsa.is/media/5200/hs-norwegian-prima-msi-report.pdf
Brake
on 01.05.21 J.Müller celebrate the 200th anniversary of the company German report: https://jmueller.jp-labs.de/jubilaeum/
Papenburg
The Meyer shipyard located in Papenburg, Germany, announced, they secured an order for a new cruise ship. The new customer is NYK who placed an order for a medium size cruise ship for their brand Asuka Cruises. Full article + image: https://www.cruisedeck.de/meyer-werft-sichert-sich-neubau-auftrag/