General information

Name:
Eastham
Country:
United Kingdom
UN/Locode:
GBEAM
Local time:
Moored Vessels:
4
Expected Vessels:
3
Berths:
1
Coordinates:
N 53° 19' W 002° 57'

Moored Vessels

Name
Type
Moored
Unclassified
11.12. 14:55
Tugboat
10.12. 19:51
Tugboat
05.12. 17:39

Expected Vessels

Name
Type
Expected
Tanker
11.12. 17:00
Tanker
12.12. 08:00
Tanker
12.12. 22:00

Sailed Vessels

Name
Type
Sailed
Cargo Ship
11.12. 13:52
Tanker
11.12. 13:13
Tanker
11.12. 12:23
Tanker
11.12. 00:03
Unclassified
10.12. 22:27
Tanker
10.12. 21:58
Tanker
10.12. 21:07
Cargo Ship
10.12. 12:38
Tanker
10.12. 11:51
Tanker
10.12. 10:10

Latest news

Hydrodec to build UK's first oil re-refinery

Mon Aug 03 08:49:48 CEST 2015 arnekiel

Peel Ports Group on 31 July announced a deal worth GBP40 million (USD62.4 million) with the Hydrodec Group that will see the UK's first purpose-built oil re-refinery constructed on a nine-acre site at Port Wirral in Eastham. Hydrodec, which operates two other used oil re-refineries, in Ohio, US, and in New South Wales, Australia, expects to begin construction in 2016 and have the facility on stream in 18 months. It picked Port Wirral - which is being redeveloped - because of excellent transport connections by road, rail, and water, the latter via the River Mersey and Manchester Ship Canal. http://www.ihsmaritime360.com/article/18841/hydrodec-to-build-uk-s-first-oil-re-refinery

Upload News