General information

Name:
Eastham
Country:
United Kingdom
UN/Locode:
GBEAM
Local time:
Moored Vessels:
6
Expected Vessels:
2
Berths:
1
Coordinates:
N 53° 19' W 002° 57'

Moored Vessels

Name
Type
Moored
Tanker
30.07. 03:44
Tanker
28.07. 17:12
Tugboat
30.07. 03:50
Tugboat
29.07. 05:06
Tugboat
29.07. 16:11

Expected Vessels

Name
Type
Expected
Tanker
01.08. 03:00
Tanker
02.08. 07:00

Sailed Vessels

Name
Type
Sailed
Tanker
30.07. 03:00
Cargo Ship
29.07. 18:15
Cargo Ship
29.07. 17:43
Tanker
29.07. 16:02
Cargo Ship
29.07. 14:20
Tanker
28.07. 15:01
Cargo Ship
28.07. 14:22
Tanker
28.07. 05:58
Tanker
28.07. 05:12

Latest news

Hydrodec to build UK's first oil re-refinery

Mon Aug 03 08:49:48 CEST 2015 arnekiel

Peel Ports Group on 31 July announced a deal worth GBP40 million (USD62.4 million) with the Hydrodec Group that will see the UK's first purpose-built oil re-refinery constructed on a nine-acre site at Port Wirral in Eastham. Hydrodec, which operates two other used oil re-refineries, in Ohio, US, and in New South Wales, Australia, expects to begin construction in 2016 and have the facility on stream in 18 months. It picked Port Wirral - which is being redeveloped - because of excellent transport connections by road, rail, and water, the latter via the River Mersey and Manchester Ship Canal. http://www.ihsmaritime360.com/article/18841/hydrodec-to-build-uk-s-first-oil-re-refinery

Upload News