General information

Name:
Eastham
Country:
United Kingdom
UN/Locode:
GBEAM
Local time:
Moored Vessels:
5
Expected Vessels:
2
Berths:
6
Coordinates:
N 53° 19' W 002° 57'

Moored Vessels

Name
Type
Moored
Tanker
03.07. 07:55
Tanker
03.07. 20:11
Tanker
03.07. 09:49
Unclassified
03.07. 18:46

Expected Vessels

Name
Type
Expected
Tanker
06.07. 03:30

Sailed Vessels

Name
Type
Sailed
Tanker
03.07. 17:50
Tanker
03.07. 06:45
Tanker
02.07. 17:23
Tanker
02.07. 16:53
Tanker
02.07. 10:18
Tanker
02.07. 09:36
Tanker
02.07. 07:31
Cargo Ship
02.07. 03:55
Cargo Ship
02.07. 02:44

Latest news

Hydrodec to build UK's first oil re-refinery

Mon Aug 03 08:49:48 CEST 2015 arnekiel

Peel Ports Group on 31 July announced a deal worth GBP40 million (USD62.4 million) with the Hydrodec Group that will see the UK's first purpose-built oil re-refinery constructed on a nine-acre site at Port Wirral in Eastham. Hydrodec, which operates two other used oil re-refineries, in Ohio, US, and in New South Wales, Australia, expects to begin construction in 2016 and have the facility on stream in 18 months. It picked Port Wirral - which is being redeveloped - because of excellent transport connections by road, rail, and water, the latter via the River Mersey and Manchester Ship Canal. http://www.ihsmaritime360.com/article/18841/hydrodec-to-build-uk-s-first-oil-re-refinery

Upload News