General information

Name:
Eastham
Country:
United Kingdom
UN/Locode:
GBEAM
Local time:
Moored Vessels:
5
Expected Vessels:
6
Berths:
1
Coordinates:
N 53° 19' W 002° 57'

Moored Vessels

Name
Type
Moored
Tanker
22.02. 02:15
Tugboat
22.02. 11:24
Tugboat
23.02. 01:05
Tugboat
22.02. 08:11
Tugboat
22.02. 11:49

Expected Vessels

Name
Type
Expected
Tanker
24.02. 13:00
Tanker
25.02. 19:00
Tanker
27.02. 13:30

Sailed Vessels

Name
Type
Sailed
Cargo Ship
23.02. 02:27
Tanker
23.02. 01:43
Tanker
23.02. 00:59
Tanker
22.02. 23:36
Tanker
22.02. 23:03
Tanker
22.02. 22:53
Tanker
22.02. 10:22
Tanker
22.02. 03:19
Tanker
22.02. 02:06
Tanker
22.02. 01:07

Latest news

Hydrodec to build UK's first oil re-refinery

Mon Aug 03 08:49:48 CEST 2015 arnekiel

Peel Ports Group on 31 July announced a deal worth GBP40 million (USD62.4 million) with the Hydrodec Group that will see the UK's first purpose-built oil re-refinery constructed on a nine-acre site at Port Wirral in Eastham. Hydrodec, which operates two other used oil re-refineries, in Ohio, US, and in New South Wales, Australia, expects to begin construction in 2016 and have the facility on stream in 18 months. It picked Port Wirral - which is being redeveloped - because of excellent transport connections by road, rail, and water, the latter via the River Mersey and Manchester Ship Canal. http://www.ihsmaritime360.com/article/18841/hydrodec-to-build-uk-s-first-oil-re-refinery

Upload News