General information

IMO:
MMSI:
244750048
Callsign:
PE6672
Width:
7.0 m
Length:
49.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Sailing vessel
Ship type:
Flag:
Netherlands
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
219.5° / -128.0
Heading:
511.0° / -128.0
Speed:
Max speed:
Status:
moored
Location:
Amsterdam (Amsterdam Centraal)
Area:
Netherlands
Last seen:
2024-03-01
55 days ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
1241 days ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2023-10-20
2024-03-02
133d 22h 5m
2023-06-14
2023-07-14
30d 13h 7m
2022-08-29
2023-06-14
288d 21h 5m
2022-07-06
2022-08-29
54d 3h 8m
2022-01-20
2022-04-22
91d 3h 52m
2021-10-28
2021-10-28
12h 3m
2021-10-25
2021-10-28
3d 2h 11m
2021-10-16
2021-10-25
9d 4h 39m
2021-09-26
2021-10-13
16d 9h 57m
2021-01-03
2021-07-01
179d 17h 20m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Amsterdam Breakwaters
2021-08-20
Enter
IJmuiden
2021-07-01
Leave
Amsterdam Breakwaters
2021-07-01
Leave
Delfzijl Gateway
2020-05-25
Enter
Delfzijl
2020-05-25
Enter
Delfzijl
2020-05-25
Leave
Delfzijl Gateway
2020-05-25
Leave
Note: All times are in UTC

Latest news

Dredger suffered water ingress

Thu Jan 31 10:51:54 CET 2019 Timsen

The "Arie Cornelis", 322 dwt (EU-No.: 02103585), suffered water ingress in the night of Jan 30, 2019, in the Elbe port of Oortkaten. The ship with a crew of two on board presumably had run onto a sheet pile and suffered a breach. It started to list and was in danger of sinking. The fire rescue Hamburg was alerted and attended with 75 men. They initially tried to stabilize the dredger with capable pumps. The plan to tow it into a yard on Jan 31 at 1 a.m. failed as the water ingress could not be brought under control. One of the crew members slid onto the deck and suffered a foot fracture. He had to be taken off with a rescue tub and taken to hospital. Meanwhile, the Department of Environment and Energy has taken over the on-scene command. Although the shipyard was only about 100 meters away the way was too far for the torn-up hull. It may therefore be necessary to patch the vessel on the spot. First the approximately 2,000 liters of fuel on board had to be drained to prevent a spill. Oil barriers were laid out around the ship. After divers had pulled a leak sail over the damaged hull region, the cargo hold could be dewaterd so far, that the ship managed to reach the Marine Service Brandt Gmbh in Oortkaten, assisted by the tug "Helene" and the survey ship "Ludwig Prandtl", where it was immediately pulled onto the slipway. She left the yard again after repairs on March 26 at 7.15 p.m. and headed to Ijmuiden, where she arrived at 7.15 p.m. the same day. German reports with photo and video: https://www.ndr.de/fernsehen/Havariertes-Schiff-wird-in-Werft-untersucht,hamj77252.html https://www.ndr.de/nachrichten/hamburg/Feuerwehr-sichert-leckgeschlagenes-Schiff-,schiff1280.html https://www.mopo.de/hamburg/polizei/oortkatener-hafen-binnenschiff-droht-zu-sinken---helfer-bei-einsatz-verletzt-31962864 https://www.welt.de/regionales/hamburg/article188006125/Besatzungsmitglied-verletzt-Schiffsleck-verursacht-Feuerwehr-Grosseinsatz.html https://www.bergedorfer-zeitung.de/vier-und-marschlande/article216332853/Binnenschiff-droht-zu-sinken-Grosseinsatz.html https://www.hamburg1.de/nachrichten/39101/Arie_Cornelis_in_Werft_gebracht.html

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data